Laserfiche WebLink
EXHIBIT "A" <br /> Professional Fee Allocation <br /> Sheriffs Office Crime Scene Unit & <br /> Vehicle Compound Project <br /> Indian River County, Florida <br /> Revised May 24, 2013 <br /> Fee Allocation: <br /> The following is the professional fee allocation for the various services defined in Attachments <br /> "A" and"C" of the Original Contract. <br /> 1. Phase I-A: Spatial Needs Assessment(Programming): COMPLETED <br /> 2. Phase I-B: Master Planning: COMPLETED <br /> 3. Phase Il: Standard Architectural and Engineering Services: UNDER CONTRACT <br /> The Architectural and Engineering services for the referenced project are based upon an <br /> estimated project construction budget of$1,714,225. This value was established during <br /> the previous phases submitted to the County and the standard A/E services reflect this <br /> value accordingly: <br /> 3.1 Basis of Fee: <br /> Estimated Construction Value <br /> $1,457,225 @ 8.62%..........................................................................$ 125,602.00' <br /> 3.2 Civil Engineering Services.................................................................$ 23,800.00 <br /> .. 3.3 Reimbursable Expenses Allowance (Not to Exceed) ........................$ 8,500.00 <br /> 3.4 Subtotal..............................................................................................$ 157,902.00 <br /> 3A. Phase II-A: Standard Architectural and EnIzineering Services Work Order#3 <br /> The Architectural and Engineering Services for the referenced Vehicle Compound <br /> Project will consist of a 10,000sf covered paved vehicle storage area, a 25 x 40 metal <br /> building and associated structural, electrical, mechanical, civil sitework and <br /> landscape/irrigation. The Architectural and Engineering Fees for these services are <br /> based upon an estimated project construction budget of$329,021.00. <br /> *3.1A Basis of Fee: <br /> Estimated Construction Value <br /> $329,021.00 @ 5.975%.....................................................................$ 19,659.00 <br /> 3.2A Civil Engineering Services ..............................................................$ 17,850.00 <br /> 3.3A Reimbursable Expenses Allowance(Not to Exceed).....................$ 3,500.00 <br /> 3.4A Subtotal Phase II-A..........................................................................$ 41,009.00 <br /> The 8.62%allocation is applied to the total development value less site development costs of$257,000. <br /> Basic Fee reduced from 6.58%to 5.975% to compensate for concurrent site observation under current Crime <br /> Scene Contract. <br /> 83 <br />