Laserfiche WebLink
I 1 -III ll./l I IVla Ilu I <br /> Sheriffs Office Crime Scene Unit <br /> Vehicle Compound Project <br /> Indian River County,Florida <br /> Revised May 24,2013 <br /> Page 3 <br /> 4A. Phase III-A: Additional Services Work Order 43: <br /> Additional Services for Vehicle Compound Project, consisting of a variety of tasks, <br /> are itemized and described in Attachment "C" of Original Agreement Work Order. <br /> The following is a summary of these services and their related professional fee <br /> allocation. <br /> TOTAL <br /> TASK FEE <br /> 4.1A Interior Design Services: <br /> (1.1.1 Attachment "C") <br /> $ TBD @ 14.0%.................................................................................$ N/A <br /> 4.2A Off-Site Civil Engineering.................................................................$ TBD <br /> 4.3A Landscape Architectural Services..................................................$ 5,335.00 <br /> 4AA Site and Building Identifications (Not to Exceed).............................$ N/A <br /> 4.5A Professional Liability Insurance.........................................................$ N/A <br /> 4.6A Permitting Coordination Services ..................................................$ 3,500.00 <br /> 4.7A Sales Tax Exemption Program...........................................................$ By GC/IRC <br /> 4.8A Facility Energy Analysis....................................................................$ N/A <br /> 4.9A Facility Rendering..............................................................................$ N/A <br /> • Reimbursable Expenses..............................................................$ N/A <br /> 4.10A Special Engineering/Fire Protection...............................................$ 2,500.00 <br /> 4.1013 Special Engineering/CSI Administrative Approval......................$ 3,850.00 <br /> 4.11A Extended Construction Observation..................................................$ TBD <br /> 4.12A Post Occupancy/Warranty Inspection................................................$ TBD <br /> 4.13A Cost Estimating: <br /> 4.13.1A Schematic Design Phase.....................................................$ N/A <br /> 4.13.2A Design Development Phase ................................................$ N/A <br /> 4.13.3A 75% Construction Documents Phase..................................$ N/A <br /> 4.13.4A 95% Construction Documents Phase..................................$ N/A <br /> 4.14A Computer Cable System Design (Not to Exceed)..............................$ N/A <br /> 4.15A Security Consultant ........................................................................$ 2,500.00 <br /> 4.16A Site Surveying....................................................................................$ By County <br /> 4.17A Geotechnical Engineering...................................... $ By County <br /> 4.18A Grants Application Assistance....................................................... $ N/A <br /> 4.19A Additional Construction Observation Services..................................$ TBD/See Below <br /> 4.20A Record/Conformance Drawings....................... $ TBD <br /> .................................. <br /> 4.21A Voter Referendum Assistance (if requested).....................................$ N/A <br /> 4.22A "Basic" Level LEED Design& Certification ....................................$ N/A <br /> 4.23A Traffic Impact Study (T.I.S.)..............................................................$ TBD <br /> 4.25A Communications Consultant..............................................................$ N/A <br /> 4.26A Audio-Visual Consultant ...................................................................$ N/A <br /> 4.24A Subtotal Phase III-A.........................................................................$ 17,685.00 <br /> 85 <br />