Version Posted:March 2012
<br /> ProiectNane:IRCSO Vehicle Compound
<br /> CONSTRUCTION COMPLEXITY GROUP-PERCENTAGE
<br /> COST FOR BUILDING
<br /> Siteworli Not A B C D E F G
<br /> wr- included)
<br /> $329,021:00 1 10.19% 928% 9.30% 8.38% 7.47% 6.58% 11110%
<br /> CALCULATED FEE $33,543 $30,532 $30,612 1$27,570 $24,594 521,660 537,605
<br /> Instructions Fill In probable construction cost at left and push enter key.
<br /> GROUP DEFINITIONS:
<br /> 'A"-CONSIDERABLY MORE THAN AVERAGE COM PLEXITY:Complex Laboratories,Medical Hosptals,Emergency ManagementCenters
<br /> 'B"•MORE THAN AVERAGE COMPLEXITY:Average Laborabrias,Mental Howlals,Simple Medical Hospitals,Crinlos,Court Houses,
<br /> Theatres,Complex Unlversty Buildings,Spedal Purpose Classrooms,Laboratory Classrooms,Librades;Audbriums,Museums,Air Termhes,
<br /> FoodSeiv ce Faoiles,SpedaSzed Deten€on Areas,Delenlon-TreatnenlAreas,Residences
<br /> 'C"-REPAIRS AMD RENOVATIONS:Miscellaneous Repairs and Renovalons,Ali eratons to OfSce Space or Dorm"Space,Fire Code
<br /> Co(red%*)&brk
<br /> 'D' AVERAGE COMPLEXITY:General O€a Space,General Teaching Space,Gymnasiums,General Detrn!on living FaWtes,Factory
<br /> BuEdings
<br /> 'E`•LESS THAN AVERAGE COMPLEXITY:Apartment BuZr)gs,Dormitory Buildings,Service Garages,Stadiums,Repetive Design FadVes,
<br /> 03ce Bu�mgs wS3i,Undelined Interior Space(open br Ialer padfoning),Spedabed Parldrg StuctNres
<br /> F'-CONSIDERABLY LESS THAN AVERAGE COMPLEXITY:warehouses,P*Nng Garages,Storage Faalites
<br /> 'G'-BUILDING ENGINEERING SERVICES:Mechanical,Electical and Stuairal notexceedaig 51,000,000In consrucEon(Not including Site
<br /> Cm
<br /> ADDFT16NAL SERVICES&'EXPENSES:
<br /> ThefoHowing services are considered Additional to Basic Services and are not included within
<br /> the bask fee represented by the fee guides:
<br /> -Feaslti7y SUdies/Anaysis -LEED Consultation
<br /> -FacilityProgramming Graphic and 134-oge Design
<br /> -Master Planning -Special Code Revievis including ACHA
<br /> -Soils Invesfga onslReports •Detai.ed Cost Estimates
<br /> Surveys•Topographir/Boundary -Documents Prepared For.
<br /> Vegeta`on"prowmenisfU015ss -Atlernala Bids FxceeGng Conrad Scope
<br /> -Measured Dra-MIngs of Fxdsfrig facilifes -Excessht Change Orders
<br /> -Exisfng FadRes Analysts -Mullp'e Construction Contracts
<br /> -Toxic Substance Mi69afon Surveys and Consuttafion -Record DecumenWAs Bm1s
<br /> -Sil3 Environmental Assessments -Prolonged Conslrud-on COntactAdministtaton Services
<br /> -Silo DRI,PUD,Site Plan ReV&w andbr Zoning Mocrk4ons -Stucloral Threshold Inspections
<br /> -Tra3cAnalysis and Tra5asignal warrant Studies -Pro)edRepresentaton During
<br /> -CIA Engineerirg Design Indudng PavingGrading Consh icfon Beyond Bi-Montiy AdministraSon
<br /> IDranageiSbrmwler ManagemenliEnvironmenW&All Site -Aftlional Conshucfon Contact
<br /> Permidng Admhistafon Services Eor Rlulip!e Contacts
<br /> -Existing Sre Wily Inrastructrre Improvements -Bui.ng Commission`ng and Training Servoes
<br /> Silo Llghing Design -PoslOecupancy Inspecfons/EvaluaSons
<br /> -Landscape Arch intural&Inigafon Design -Renderugs/Models
<br /> .Speda'y Consultants -Substantive Changes to Scope,She or Complexity
<br /> Voloe/ r3Commurkalons;ElectonkJAud-b -OxnerRequested Changes to Approved Documents
<br /> Visual;Food Service Equipment Hamdous -Reimbursable Expenses'
<br /> Material;Hospltarlaboralory,Inlerior Design;Indoor Including,but not limited b,reproducton/printing costs,
<br /> At Ouarty,Ouafiy Contol;ThWer/Acoustical; ravel expenses and special mail service expenses
<br /> Searifi
<br /> -A Cycle Cost(RN and/or federal DOE Energy Analysis
<br /> As defined in fie Division of Real Estate Devetopmen(and Management Form of Agreement BeWeen Orrner and Architect-Engineer.
<br /> 1 of 1 5/21/2013 8:15 AM
<br /> 87
<br />
|