My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page - 2 — <br />UTILITIES: ENIERGENCY <br />ITEM <br />Elster, to its credit, flew over two representatives from Aichi Japan where the meters are fabricated. It <br />(W was part of their commitment to research and investigate why the meters were failing. Ultimately, <br />changes to the meter manufacturing would be needed to prevent this from occurring in the future. In <br />addition, sacrificial zinc anodes were recommended Elster to be placed on the exterior of the meter to <br />prove e cat l�—odic protecrron� -t e -meta : In- short;= the zinc would=begin-to-corrode faster than the—-- <br />associated metal and is used as a preventative measure. <br />On March 27, 2013 Elster, its Japanese experts, IRCUD and Avanti met at the Utilities conference <br />room to formalize a path forward. Elster verbally agreed to fabricate and provide 189 new meters <br />using a change in its manufacturing process to address the heat passivation issue and it would provide <br />the zinc anodes. <br />Elster and IRCUD have been negotiating the terms and logistics of the Remedy Agreement since that <br />time. Elster and its legal department have been working with Indian River County and its legal <br />department to refine the specifics and to solidify each party's responsibilities and understandings. <br />Attached is the remedy agreement which outlines the process moving forward. <br />As part of this process, the Utility department is understandably concerned about the proposed <br />manufacturing process. Elster assures us that this change will address the issues but staff has been <br />interested in a more real-time method to determine if the meters are functioning properly. The Utilities <br />department wishes to purchase additional modules from Elster in order to track consumption and <br />data -log meter operation. These modules will allow staff to read meters more quickly and efficiently. <br />As part of the Remedy Agreement, IRCUD will receive 189 modules along with the new meters. <br />IRCUD will only be required to pay half the cost now ($19,089). If all the meters are working <br />properly after a years' time, then the remaining 50% or $19,089 would be paid to Elster. Since the <br />modules cannot be sourced through other competitors, staff is asking for Board approval to sole source <br />the modules directly from Elster. A sole source letter is attached. <br />Time is of the essence. Due to the condensed timeframe before most of our seasonal residents come <br />back to Vista Gardens and Vista Royal, staff is adding this remedy agreement as an emergency item. <br />Once approved, Elster has committed to IRCUD to have all 189 of the new meters to IRCUD by <br />August 31, 2013. <br />FUNDING: <br />Funding for the Elster Modules is available from the Capital Account 471-166008. Funding for this <br />account is derived from water and sewer sales. <br />ACCOUNT NO.: <br />Description Account Number Amount <br />Elster Meter Modules 471-166008 $38,178.00 <br />/yo •0L <br />
The URL can be used to link to this page
Your browser does not support the video tag.