Laserfiche WebLink
6.03 Final Payment <br />A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of <br />�r the General Conditions, OWNER shall pay the remainder of the Contract Price as <br />recommended by ENGINEER as provided in said paragraph 14.07. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied- as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br />(W subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br />in or relating to existing surface or subsurface structures at or contiguous to the Site <br />(except Underground Facilities) which have been identified as provided in paragraph 4.02 <br />of the General Conditions and (2) reports and drawings of a Hazardous Environmental <br />Condition, if any, at the Site which have been identified as provided in paragraph 4.06 of <br />the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all examinations, investigations, explorations, tests, studies, and data concerning <br />conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect <br />of the means, methods, techniques, sequences, and procedures of construction to be <br />employed by CONTRACTOR, including applying the specific means, methods, <br />techniques, sequences, and procedures of construction, if any, expressly required by the <br />Contract Documents to be employed by CONTRACTOR, and safety precautions and <br />programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />(W others at the Site that relates to the Work as indicated in the Contract Documents. <br />Attachment D - 00520 - Agreement - Addendum No. 2 <br />ADDENDUM NO. 2 00520 - 3 n <br />F:Tublic WorksWeithmstormwater Projects\PC South ConstructionWgenda ItemsWttachment D - 00520 - Agreement - Addendum No. 2.doc Rev. 05101 y <br />