Laserfiche WebLink
ATTACHMENT I —SAMPLE AGREEMENT WITH FELIX ASSOCIATES OF FLORIDA <br /> SECTION 00530 - EJCDC <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> Bid No. 2013038 <br /> SOUTH COUNTY BRINE DISPOSAL PIPELINE <br /> THIS AGREEMENT ("Agreement" or"Contract") dated 20 <br /> by and between Indian River County, a political subdivision of the State of Florida ("OWNER") and <br /> Felix Associates of Florida Inc. ("CONTRACTOR"). <br /> BACKGROUND RECITALS <br /> A. Pursuant to applicable provisions of Florida law, OWNER has selected CONTRACTOR to perform <br /> certain work as more specifically described in the Contract Documents as defined in Article 8 of this <br /> Agreement and the term is as set forth in the Contract Documents. <br /> B. CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br /> Documents on the terms set forth in the Contract Documents. <br /> NOW THEREFORE, OWNER and CONTRACTOR, in consideration of the mutual covenants <br /> hereinafter set forth, and intending to be legally bound, agree as follows: <br /> ARTICLE 1 WORK <br /> 1.1. CONTRACTOR as an independent contractor and not as an employee shall furnish and <br /> complete all of the necessary labor, material, and equipment to perform the work as specified or <br /> indicated in the Contract Documents. CONTRACTOR shall complete all work as specified or <br /> indicated in the Contract Documents. The work is generally described as follows, and shall include, <br /> but is not necessarily limited to the following: <br /> Construction of 24-in canal intake watermain, a 12-in RO concentrate <br /> main, and ancillary forcemain relocations as shown on the Construction <br /> Drawings. This work shall include but is not limited to approximately <br /> 4,604 LF of 24-in PVC open cut canal intake watermain (CIWM), 142 LF of <br /> 24-in aerial crossing, 1479 LF of 24-in HDPE directional bore CIWM (or <br /> alternate 24-in fusible PVC), 301 LF of 12-in PVC open cut RO <br /> concentrate pipe, 258 LF of 12-in HDPE directional bore RO concentrate <br /> pipe (or alternate 12-in fusible PVC), 280 LF of a relocated 4-in forcemain <br /> (FM), and all associated connections as shown on the Construction <br /> Drawings. Construction also includes, but is not limited to, utilities <br /> exploration, coordination with any permitting agencies, trenching, <br /> dewatering, installation of pipe with fittings and all appurtenances, <br /> valves, wet taps, ARV's, bridge modifications, restrainers, soil <br /> compaction, and testing, all restoration including road and drive <br /> restorations, sod, private property replacement or repair, franchise utility <br /> repair, traffic control, construction staking, decommissioning of existing <br /> pipes, and any other improvements or items required for a complete and <br /> 00530-1 <br /> 203 <br />