My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:15:07 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jesse Roland <br /> June 6, 2013 <br /> Page 2 <br /> Proposal IRS-13-178 <br /> 2. Closed level run including bench marks set on control points as well as off-site: <br /> 2 Man Crew @ 16 hours= $1,920 $1,536 <br /> 3. Digital terrain mapping including but not limited to: <br /> a. Vegetation, specified trees, existing utilities, existing potable wells, main shut <br /> valve at each residence or point of entry of water service, street signs and all <br /> drainage structures and drainage pipes. <br /> b. Cross sections every 100 feet along all right of ways extending 10 feet beyond <br /> existing right of way lines. <br /> C. Locate and identify driveways, sidewalks, headwalls, pipe ends, inverts <br /> (size, material and length). <br /> 2 Man Crew @ 53.5 hours= $6,420 $5,136 <br /> 4. Cad drafting: <br /> Cad Tech I @ 50.75 hours= $4,060 $3,248 <br /> Cad Tech II @ 12.3 hours = $ 861 $ 689 <br /> Project Surveyor I @ 23.6 hours = $3,304 $2,643 <br /> We propose to provide the above described services in Task 1 for a total fee of $21,585 or <br /> $17,268 with 20% discount <br /> Task 2 (Indian River County Re-Use Water Discharge Oration) <br /> 1. Topo top of bank to edge of water on south side of existing stormwater pond. Map route <br /> for reclaim water as specified, including location and elevation of existing control <br /> structure, control elevation and water level. <br /> 2 Man Crew @ 4 hours = $ 480 <br /> 2. Cad drafting: <br /> Cad Tech I @ 1.25 hours= $ 100 <br /> Cad Tech II @ 0.7 hours= $ 49 <br /> Project Surveyor I @ 0.4 hours= $ 56 <br /> We propose to provide the above described services in Task 2 for a total fee of$685. <br /> Any services requested that are not stated above may require a separate proposal, or will be <br /> considered additional services and will be billed at the previously agreed to hourly rates. <br /> Payment for our services is due as stated in signed contract. <br /> This proposal is not valid if not executed by the accepting party and received in this office within <br /> sixty (60) days of the date of this proposal as printed above. <br /> L <br /> 230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.