Laserfiche WebLink
under this Contract and for every act and neglect of the OWNER and others <br /> relating to or arising out of the work. Any payment, however, final or-otherwise, <br /> shall not release the CONTRACTOR or its sureties from any obligations under <br /> the Contract Documents or the Public Construction Bond. <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br /> paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br /> ARTICLE8 -CONTRACTOR'S REPRESENTATIONS <br /> 8.01 In order to induce OWNER to enter into this Agreement TRA C R makes the <br /> following representations: <br /> A. CONTRACTOR has examined and carefully ed the Con Docum and the <br /> other related data identified in the Bidding Docume <br /> B. CONTRACTOR has visited the Site c - fam 'th and 's s sfied as to the <br /> general, local, and Site conditions th y affe st, p ss, erformance of the <br /> Work. <br /> C. CONTRACTOR is familiar with atisfi to all federal, state, and local Laws and <br /> Regulations that may affect cost, , and rmance of the Work. <br /> (W D. CONTRACTOR h ully Stu a 1) r s of explorations and tests of <br /> subsurface conditio tiguo o th and all drawings of physical conditions <br /> in or relating to existi urfac tructures at or contiguous to the Site <br /> (except round es) ave been identified in the Supplementary <br /> Condition 'ded in p aph the General Conditions and (2) reports and <br /> drawings o us En ental ondition, if any, at the Site which have been <br /> identified in t up ary 'tions as provided in paragraph 4.06 of the General <br /> ions. <br /> E. NTRACTOR h tained and carefully studied (or assumes responsibility for having <br /> do r supplementary examinations, investigations, explorations, tests, <br /> Stu o ing conditions (surface, subsurface, and Underground Facilities) <br /> at or contiguous he Oile which may affect cost, progress, or performance of the Work <br /> or which relate any aspect of the means, methods, techniques, sequences, and <br /> procedures truction to be employed by CONTRACTOR, including applying the <br /> specific mea , methods, techniques, sequences, and procedures of construction, if any, <br /> expressly required by the Contract Documents to be employed by CONTRACTOR, and <br /> safety precautions and programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> conditions of the Contract Documents. <br /> (6W G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents. <br /> 00520-Agreement(Public Works)SAMPLE.doc <br /> 00520-5 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\9334-12th Street&27th Avenue Intersection Improvements\Admimlagenda items\00520-Agreement(Public Works) Vh <br /> SAMPLE.doc <br />