My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
under this Contract and for every act and neglect of the OWNER and others <br />relating to or arising out of the work. Any payment, however, final or -otherwise, <br />shall not release the CONTRACTOR or its sureties from any obligations under <br />the Contract Documents or the Public Construction Bond. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreeme <br />following representations: <br />A. CONTRACTOR has examined and carefully <br />other related data identified in the Bidding Doc <br />CONTRACTOR has visited the S <br />general, local, and Site conditions <br />Work. m <br />C. CONTRACTOR is familiar with <br />Regulations that may affect cost, <br />IC <br />E. <br />CONTRACTOR <br />subsurface cond <br />in or relating to <br />(except LhoKgi <br />makes the <br />and the <br />as to the <br />ice of the <br />all federal, state, and local Laws and <br />rmance of the Work. <br />) rdWs of explorations and tests of <br />and all drawings of physical conditions <br />tructures at or contiguous to the Site <br />been identified in the Supplementary <br />General Conditions and (2) reports and <br />on, if any, at the Site which have been <br />:)vided in paragraph 4.06 of the General <br />N I KAC: I UK h tained and carefully studied (or assumes responsibility for having <br />),metilhods, <br />r supplementary examinations, investigations, explorations, tests, <br />Stu ing conditions (surface, subsurface, and Underground Facilities) <br />at or contighe ite which may affect cost, progress, or performance of the Work <br />or which reany aspect of the means, methods, techniques, sequences, and <br />proceduresruction to be employed by CONTRACTOR, including applying the <br />S <br />metechniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />00520 - Agreement (Public Works) SAMPLE.doc <br />00520-5 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\9334-12th Street & 27th Avenue Intersection Improvements\Admimlagenda items\00520 -Agreement (Public Works) Vh <br />SAMPLE.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.