My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:15:07 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br /> RF CONCRETE CONSTRUCTION, INC. <br /> ,. P.O. Box 650789, Vero Beach, Florida 32965 <br /> 664 Old Dixie Highway, Vero Beach, Florida 32962 <br /> Phone: 772-567-3356/Fax: 772-778-2142 <br /> Change Order Submitted to Project Name Date <br /> Proctor Construction Company IRC Sheriff's Crime Scene Facility April 23, 2013 <br /> Street Project location Change Order Number 1 <br /> 2050 US Hwy, 1, Suite 200 Vero Beach, FL. (REVISED) <br /> City, State and Zip Telephone <br /> Vero Beach, FL. 32960 772-234-8164 <br /> Attn. Fax: Email.• <br /> Nick Bischoff 772-234-8188 nbischoff@proctorcc.com <br /> We hereby agree to make the change(s) specified below: <br /> Supply 4 .Install Metal Build/ng Components to support new AHU and frame openings for added Louvers in a <br /> finished wall. <br /> 0 Supply & install 8" 16GA. Purlins @ 24'-0" long to support AHU-10. <br /> a Supply & install (2) Framed Openings for a 24" x 24" Louver. <br /> e Cut out Wall Panel and Insulation inside new openings <br /> e Supply & install J-Trim around all Framed Openings. <br /> 0 8" C-Channel with Clips will be used for all Framed Openings. <br /> Le All misc. Bolts, Nut's, Screws, welding, Etc., are included <br /> 9 All Taxes, Freight and Trim Box <br /> MATERIAL TOTAL - $1,550.60 <br /> LABOR TOTAL - $2,400.00 <br /> TRIM BOX & FREIGHT COST - $475.00 <br /> TOTAL - $4,425.60 <br /> 15% OH&P - $663.84 <br /> CHANGE ORDER TOTAL - $5,089.44 <br /> NOT-INCLUDED: <br /> 8" and 6" Exhaust/intakes <br /> a Damper <br /> We hereby agree to make the changes(s) specified above at this price: $5,318.75 <br /> Previous Contract Amount: <br /> Revised Contract Amount: <br /> RF CONCRETE CONSTRUCTION, INC. Authorized Signature <br /> ACCEPTANCE OF CHANGE ORDER—The above prices and specifications of this Change Order are satisfactory and are <br /> hereby accepted. All work to be performed under the same terms and conditions as specified In original contract unless otherwise <br /> stipulated. <br /> (W DATE OF ACCEPTANCE: SIGNATURE: <br /> 103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.