My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />RF CONCRETE CONSTRUCTION, INC. <br />,. P.O. Box 650789, Vero Beach, Florida 32965 <br />664 Old Dixie Highway, Vero Beach, Florida 32962 <br />Phone: 772-567-3356 / Fax: 772-778-2142 <br />Change Order Submitted to Project Name Date <br />Proctor Construction Company IRC Sheriff's Crime Scene Facility April 23, 2013 <br />Street Project location Change Order Number 1 <br />2050 US Hwy, 1, Suite 200 Vero Beach, FL. (REVISED) <br />City, State and Zip Telephone <br />Vero Beach, FL. 32960 772-234-8164 <br />Attn. Fax: Email.• <br />Nick Bischoff 772-234-8188 nbischoff@proctorcc.com <br />We hereby agree to make the change(s) specified below: <br />Supply 4 .install Metal Build/ng Components to support new AHU and frame openings for added Louvers in a <br />finished wall. <br />0 Supply & install 8" 16GA. Purlins @ 24'-0" long to support AHU-10. <br />a Supply & install (2) Framed Openings for a 24" x 24" Louver. <br />e Cut out Wall Panel and Insulation inside new openings <br />e Supply & install J -Trim around all Framed Openings. <br />0 8" C -Channel with Clips will be used for all Framed Openings. <br />Le All misc. Bolts, Nut's, screws, welding, Etc., are included <br />9 All Taxes, Freight and Trim Box <br />MATERIAL TOTAL - $1,550.60 <br />LABOR TOTAL - $2,400.00 <br />TRIM BOX & FREIGHT COST - $475.00 <br />TOTAL - $4,425.60 <br />15% OH&P - $663.84 <br />CHANGE ORDER TOTAL - $5,089.44 <br />NOT -INCLUDED: <br />8" and 6" Exhaust/intakes <br />a Damper <br />We hereby agree to make the changes(s) specified above at this price: $5,318.75 <br />Previous Contract Amount: <br />Revised Contract Amount: <br />RF CONCRETE CONSTRUCTION, INC. Authorized Signature <br />ACCEPTANCE OF CHANGE ORDER —The above prices and specifications of this Change Order are satisfactory and are <br />hereby accepted. All work to be performed under the same terms and conditions as specified In original contract unless otherwise <br />stipulated. <br />DATE OF ACCEPTANCE: SIGMA <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.