Laserfiche WebLink
CONSEW <br /> INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM <br /> tw <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director <br /> And <br /> Christopher J. Kafer,Jr., P.E., County Engine r <br /> FROM: Michael D. Nixon, P.E., Roadway Production Manager <br /> SUBJECT: Amendment No. 19 to the Professional Services Agreement with <br /> Carter Associates, Inc. IRC Project No. 9810B <br /> 66th Avenue Paving Improvements, Phase 2 (4th Street to 16th Street) <br /> (Additional Utility Improvements) <br /> DATE: June 20, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> On June 18, 2013, the Board of County Commissioners approved the extension of an eight(8")water <br /> main along 66th Avenue from just south of 12th Street to 16th Street. This extension will complete a <br /> looped system between 4th Street and 16th Street to improve flow, pressure and fire protection to the <br /> area. <br /> At the request of the Utilities Services Department, Carter Associates, Inc. prepared a proposal for <br /> additional engineering design, permitting and inspection services. <br /> Indian River County entered into a Professional Services Agreement with Carter Associates, Inc. on <br /> November 17, 1998 for the above subject project and the Board of County Commissioners has approved <br /> Amendment Nos. 1 through 18 for additional services, bringing the current total for the Agreement to <br /> $706,925.00. <br /> Amendment No. 19 includes the following Scope of Services and cost: <br /> Design and drafting 2900 linear feet of 8-inch water main $3,000.00 <br /> Design and drafting drainage crossings $1,600.00 <br /> Design and detail aerial bridge crossing and approaches $1,800.00 <br /> Quantity takeoff and table $700.00 <br /> Prepare gnchsend deliverables(Design and As-builts) $250.00 <br /> FDEP permitting(1 new permit) $650.00 <br /> Inspection (28 Hours) $2,300.00 <br /> Inspection Administration $560.00 <br /> (W FDEP Certifications $560.00 <br /> Total (Lump Sum) S11.420.00 <br /> F-TuNic WorUTNGINEERING DMSION PROJECTS\9810B-66th Ave Ph 2 4th St to 16th St\Admim\agenda ite=M 10 BCC Aga-Amend 19 06-18-13.doc <br /> 89 <br />