My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/2013 (2)
CBCC
>
Meetings
>
2010's
>
2013
>
07/02/2013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:20:22 PM
Creation date
3/23/2016 8:58:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2013
Meeting Body
Board of County Commissioners
Book and Page
376
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NF.tif
SmeadsoftID
14220
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO. 19 TO THE PROFESSIONAL <br /> ENGINEERING SERVICES AGREEMENT <br /> 66TH AVENUE PAVING AND DRAINAGE IMPROVEMENTS, PHASE 2 <br /> BETWEEN 4TH STREET AND 16TH STREET <br /> IRC PROJECT NO. 9810B <br /> THIS is an amendment-to the existing AGREEMENT dated NOVEMBER 17, 1998, including <br /> AMENDMENTS NUMBER 1 through 18,between CARTER ASSOCIATES,INC.(ENGINEER)and INDIAN <br /> RIVER COUNTY(COUNTY). The proposed scope of work includes design for water mainline section that will <br /> loop the transmission main from 4"'Street to 16th Street along 66th Avenue,thereby providing multi-connected <br /> water service. This work includes approximately 2,900 linear feet of additional buried 8 inch diameter water <br /> main,with an aerial crossing located on the new roadway bridge crossing the IRFWCD Main Canal. The scope <br /> will also include inspections and final certification of completion. All provisions of the original Professional <br /> Engineering Services Agreement including Amendment Nos. 1 through 18 shall remain in full force and effect, <br /> unless otherwise specifically modified. This amendment addresses changes in "SCOPE OF SERVICES", <br /> "COMPENSATION"and"TIME OF COMPLETION"of the AGREEMENT. <br /> SCOPE OF SERVICES <br /> See attached letter from Carter Associates,Inc.dated June 17,2013,(Exhibit A)which specifies changes <br /> in the "SCOPE OF SERVICES"and"COMPENSATION". <br /> COMPENSATION <br /> This section of the AGREEMENT entitled SECTION V-COMPENSATION shall be revised in response <br /> to the Scope modifications set out herein. The charges associated with this AMENDMENT NO. 19 are as <br /> follows: <br /> Design and drafting 2900 linear feet of 8 inch diameter water main $3,000.00 <br /> Design and drafting drainage crossings $1,600.00 <br /> Design and detail aerial bridge crossing and approaches $1,800.00 <br /> Quantity takeoff and table $700.00 <br /> Prepare and send deliverables (Design and As-builts) $250.00 <br /> FDEP permitting(1 new permit) $650.00 <br /> Inspection(28 Hours) $2,300.00 <br /> Inspection Administration $560.00 <br /> FDEP Certifications $560.00 <br /> fir,,. Total (Lump Sum) $11,420.00 <br /> CADocuments and Settings\syb9,Agoca1 Settingffemporary Intemet Fi1es\0LK67\9810 Amendment 19 06-18-13.doc 1 91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.