My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/2013 (2)
CBCC
>
Meetings
>
2010's
>
2013
>
07/02/2013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:20:22 PM
Creation date
3/23/2016 8:58:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2013
Meeting Body
Board of County Commissioners
Book and Page
376
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NF.tif
SmeadsoftID
14220
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Prepare FDEP Permit Application,with County provide the$650 Application Fee. <br /> P PP ty to P rovPP <br /> 7. Provide inspection of materials, conflict crossings, aerial crossing, sample point locations and final <br /> pressure test. The day to day inspection and assurance of construction complying with State and <br /> County standards shall be performed by the County Utility Inspector. <br /> 8. Perform FDEP certification of completion,for FDEP permitted facilities only. <br /> Compensation: <br /> The estimated costs to provide the above stated additional services are as follows: <br /> 1. Design and draft 3,000±LF of Buried 8-inch Main $3,000.00 <br /> 2. Design and draft Drainage Crossings $ 1,600.00 <br /> 3. Design and detail Aerial Bridge Crossing and Approaches $ 1,800.00 <br /> 4. Prepare Quantity Take Off and Table $ 700.00 <br /> 5. Prepare and Transmit Deliverables(Design and As-Builts) $ 250.00 <br /> 6. FDEP Permitting(1 new permit) $ 650.00 <br /> 7. Inspection(28 hours) $2,300.00 <br /> 8. Inspection Administration $ 560.00 <br /> 9. FDEP Certification(1 permit) 560.00 <br /> Total= $11,420.00 <br /> Amendment No. 19 additional services shall be invoiced on a time and materials basis,with a lump sum total <br /> cost of$ 11,420.00. <br /> Please feel free to contact me should you have any questions or concerns regarding our proposed scope of <br /> work or terms of agreement. <br /> Sincerely, <br /> 7er late c.ay .Luethje,PSM <br /> Principal/Vice-President <br /> sds <br /> cc: Michael Nixon,P.E.—IRC Engineering <br /> Gordon Sparks,P.E.—IRC Utilities <br /> Steve Snoberger,P.E.-CAI <br /> SeMi2g Hoicla <br /> i <br /> Since ni i <br /> N:\PSW\P\98-23E\Agreements\Amendmentl9 Proposal 6-21-13.doc Page 2 of 2 <br /> 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.