My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/09/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/09/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:23:07 PM
Creation date
3/23/2016 8:59:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/09/2013
Meeting Body
Board of County Commissioners
Book and Page
119
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NG.tif
SmeadsoftID
14221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The CONSULTANT shall design and prepare a complete set of site construction plans for <br /> obtaining County site plan approval,building permits,and other site development jurisdictional <br /> agency permits. These plans shall include: <br /> (i)Site Plan <br /> (ii)Landscape design <br /> (iii) Site Electrical/site lighting <br /> (iv)Clearing, Earthwork,drainage and paving <br /> 4. The CONSULTANT shall prepare complete civil site development drawings for the construction of <br /> storm water management system requirements.All coordination with utility providers,design, <br /> f relocation or routing,and scheduling shall be by the CONSULTANT. <br /> 5. Prepare Construction Documents. Prepare Technical written specifications and provisions for <br /> building and site work components. <br /> 6. Construction Cost Estimate(s): Based on 90% complete plans, prepare a detailed site construction <br /> plan cost estimate. <br /> 7. Permits: The Consultant will prepare all applicable permit applications for all government agencies <br /> with jurisdiction, including: <br /> (i) Indian River County <br /> (ii) St.Johns River Water Management District <br /> (iii) Florida Department of Environmental Protection <br /> (iv) Army Corps of Engineers <br /> Note: Building permits: Assist contractor with the building permit review process.Provide <br /> plans, specifications and supporting documentation.Prepare response to building official. <br /> N <br /> 8.The CONSULTANT shall assist the COUNTY with the Contract Administration and Observations, <br /> including:attend progress meetings,review shop drawings and contractors submittals,and provide <br /> routine site observations to verify the work is proceeding in accordance with the plans and <br /> specifications for the purposes of certification upon completion of the work.Observations shall be <br /> documented with written reports and digital photographs.The CONSULTANT will coordinate the <br /> responsibility for document review,meeting attendance,and observations with civil engineer, <br /> architect and other consultants.The construction period is estimated to be six(6)months,and CA <br /> and observation fees have been estimated by the CONSULTANT based on this time frame. <br /> SECTION V-TIME FOR COMPLETION <br /> (1)The time for completion of each project phase shall be as follows: <br /> Design,permitting—Six(6)calendar months <br /> Construction Observation Services—to run concurrently with consruction <br /> Page 5 of 11 <br /> F:\Public Works\ENGINEERING DMSION PROJECTS\1213-IRCShooting Range-Skeet&Trap Improvemnts&Hunters Train Bldg\Admim\bid documents\Agreement-RFQ 2012024 Donadio and <br /> Assoc..doc <br /> 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.