My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2013AP-B
CBCC
>
Meetings
>
2010's
>
2013
>
08/20/2013AP-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:27:24 PM
Creation date
3/23/2016 9:00:28 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet B
Document Type
Agenda Packet
Meeting Date
08/20/2013
Meeting Body
Board of County Commissioners
Book and Page
393
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NK.tif
SmeadsoftID
14225
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X Ten sets of complete Conceptual,Preliminary or Final PD(final plat plans must be signed and sealed by <br /> surveyor). Plans as per Chapter 915,pursuant to the type of approval being requested. <br /> X Any requirements of the zoning or subdivision ordinance which the applicant is requesting to be waived <br /> (such as minimum lot width and size, street fi-ontage requirements, setbacks, etc.), shall be clearly <br /> indicated by section and paragraph numbers, together with the rationale for the waiver request(s),on an <br /> attached.sheet. <br /> X 2 Aerials for conceptual or preliminary PDs <br /> X Itemized response to pre-application for conceptual or concurrent applications <br /> X 2 sealed surveys <br /> X <br /> 3 sets of floor plans and elevation for commercial or multi-family buildings <br /> X Written Statement and Photograph of Posted Sign <br /> For Final Plat's only <br /> CONSTRUCTION COMPLETE-BUILT OUT: <br /> (A) Certificate of Completion from Public Works or copy of letter to Public Works and Utilities <br /> requiring inspection of improvements <br /> 9' <br /> IF IMPROVEMENTS ARE DEDICATED TO THE PUBLIC: <br /> (B) Original Engineer's Certified Cost for Improvements(Signed and Sealed)OR <br /> CONSTRUCTION INCOMPLETE-BONDING OUT: <br /> (A) Original Engineer's Certified Cost Estimate for Improvements(Signed and Sealed) <br /> COPIES OF DOCUMENTS TO BE RECORDED WITH THE FINAL PLAT: <br /> a. Covenants,Deed Restrictions,Bylaws,etc.or Statement'l'here Are None <br /> b. Property Owner's Association Articles of Incorporation or Statement Indicating Why Recording of <br /> POA is Not Required <br /> F:\Community Development\Uscrs\curDev\Applicatious\PDAPP.dou Revised January 2011 Page 3 of 3 <br /> 553 <br />
The URL can be used to link to this page
Your browser does not support the video tag.