Laserfiche WebLink
P.C. South Algal Nutrient Removal Facility <br /> 1225 SW 5f''Street <br /> Vero Beach, FL <br /> Indian River County Page 2 of 7 <br /> Proposal No.13-143 7.00 <br /> Laboratory soil testing will be required to identify the properties and suitability of the <br /> soil to be used at the site. Proctor tests will be required to obtain material's maximum <br /> density and optimum moisture content, which would be used to verify that the degree <br /> of compaction in the field is achieved. <br /> 1.2 Field Density/Moisture Testing <br /> GFA will provide a field technician to test the in-place density of the compacted fills. <br /> For this testing, GFA will use the Nuclear Method (ASTM D2922) in the field, which will <br /> be correlated with the corresponding laboratory proctor compaction tests. <br /> 1.3 Cast-in-Place Concrete <br /> GFA will provide an ACI-certified technician to test the concrete delivered to the site. In <br /> accordance with the project specifications, the technician will mold a set of five <br /> compression cylinders per ASTM C-31 for every 50 cubic yards or fraction thereof <br /> placed per day. GFA will also determine the slump and temperature of the concrete <br /> each time a set of cylinders are cast <br /> The cylinders will be cured in the laboratory, with one cylinder tested at seven days <br /> and three at 28 days. GFA can also assist in evaluating mix submittals and provide <br /> laboratory verifications, if necessary, although fees for this service are not included <br /> herein. <br /> 1.4 Schedule of Fees <br /> The actual cost of our services will be highly dependent on the construction schedule. <br /> As we have not been provided with a precise construction schedule, it is not possible <br /> to make a precise estimate of the manpower and testing requirements. Therefore, <br /> GFA proposes to provide its services on a unit cost basis; based on the actual work <br /> performed and the unit fees shown on the attached Schedule of Fees. For your budget <br /> purposes, GFA has estimated quantities for these services based upon the anticipated <br /> scope of work. <br /> The unit rates and/or hourly rates do not include any overtime work. Overtime work <br /> (scheduled for before 7:00 AM or going past 4:00 PM Monday through Friday, more <br /> than 8 hours in one day, more than 40 hours in one week, or anytime on Saturdays, <br /> Sundays, or Holidays), will be charged at the standard rate times 1.5. Technician Time <br /> will be charged in the event that the Contractor's work is not ready for <br /> testing/inspection upon arrival of CFA's representative, or if our minimum testing <br /> frequencies specified herein cannot be achieved. <br /> i 80 <br />