Laserfiche WebLink
�E <br />'L 2 3 BOOK F � <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E., <br />Public Works Director <br />9�� <br />FROM: Terry B. Thompson, P.E.�r <br />Capital Projects Manager <br />SUBJECT: South Beach Recreation Path ` <br />Changes and Additions <br />DATE: July 16, 1991 <br />DESCRIPTION AND CONDITIONS <br />Schopke Construction and Engineering, Inc. is under contract <br />with the City of Vero Beach for the construction of a reuse <br />water main along AIA in conjunction with the County's South <br />Beach Recreation Path. Construction of these two projects <br />were combined through a joint Construction Project <br />Agreement, dated February 12, 1991, between Indian River <br />County and the City of Vero Beach. <br />The Department of Transportation required that certain <br />revisions be made to the construction drawings prior to <br />issuance of a permit for the recreation path. These <br />revisions are detailed on the attached reference letter. <br />The cost of these changes and additions is $15,366.59. <br />The Sandpointe West Subdivision (STA 176+40 - STA 184+60) <br />has not constructed the eight foot (81) wide sidewalk along <br />SR AlA in conformance with its approved subdivision plat and <br />the developer(s) is effectively in breach of the Contract <br />for Construction. <br />The County has given the developer(s) of the Sandpointe West <br />Subdivision three options in order to comply with its <br />Contract for Construction for Remaining Improvements. These <br />options are as follows: <br />1. Construct the required 8' wide bikepath, with plans <br />approved and permitted by Indian River County and any <br />other jurisdictional agencies; <br />2. Provide a cash payment for the referenced amount of <br />$11,348.00 for Indian River County to include <br />construction of the Sandpointe West portion of the <br />bikepath in its general bikepath construction project. <br />Should the actual final cost of construction for the <br />bikeway differ from the projected cost, a refund or <br />billing of the difference, as appropriate, would occur; <br />or <br />3. Submit a written request that Indian River County <br />construct the Sandpointe West portion of the bikeway <br />and submit a bill for payment to Wildfield Properties <br />for which it would be responsible under the provisions <br />of paragraphs 6 and- 7 of the previously. referenced <br />Contract for Construction. If the payment were not <br />received, the County would then file suit against the <br />developer for breach of its Contract to Construct the <br />bikepath; and seek a cash judgement or liens against <br />the lots owned by Wildfield Properties Inc. in the <br />Sandpointe West Subdivision. <br />28 <br />- M <br />