My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/6/1991
CBCC
>
Meetings
>
1990's
>
1991
>
8/6/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:10 PM
Creation date
6/16/2015 10:40:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/06/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG Go 1991 <br />ENGINEERING WORK AUTHORIZATION <br />Date: 7- t - qJ . Work Authorization No. 2 For Consulting Services <br />Project No. US-90-01-DC/CS/ED County I.D.: PEC, Inc. (Consultant) <br />I. PROJECT DESCRIPTION <br />BOOK 6"J" <br />Additional consulting engineering services related to construction of the Blue Cypress Lake <br />Community Sewage Improvement Project.. <br />Estimate for the Project, including 15% contingency is: $512.000.00 (Construction) <br />$622.600.00 (Total Project) <br />H. SCOPE OF ADDITIONAL SERVICES AND LUMP SUM FEE FOR ADDITIONAL <br />SERVICES <br />A. Site visit to meet with FDER, who will be determining the limits of the existing <br />jurisdictional wetlands on the proposed site. <br />B. Field survey to delineate jurisdictional wetland as identified by FDER (coordination and <br />subconsultant services). <br />C. Preparation of Legal Description and sketch for proposed site (coordination and <br />subconsultant services) <br />D. Revise Construction Drawings and Specifications to reflect proposed artificial wetland <br />eftluent,disposal system. <br />E. Prepare FDER "Management and Storage of Surface Water Permit" (MSSW) Applica- <br />tion, and associated meetings and coordination with FDER. <br />F. Compensation for Additional Services. This authorization shall include a cost element <br />number two (#2). (See attached breakdown for manhours and associated costs in <br />accordance with Master Agreement). <br />Cost element shall not exceed $10,000.00 <br />Payment for cost element two may be for actual hours and actual sub -consultant fees on <br />a monthly basis. The County Shall make payment within 45 days of receipt of invoice. <br />COST ELEMENT #2 $10.000.00 <br />SUBMITTED BY: <br />PROFESSIONAL ENGINEERING <br />CONSULTANTS, INC. <br />BY: (;�� e, ag��e <br />David R. Refling, P.E. <br />Title: Principal <br />Date: R — 7— R <br />APPROVED BY: <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY <br />COMMISSIONERS <br />BY: <br />Richard N. Bird, Chairman <br />Indian River Go. 140Rroved Orae <br />Adminv ��3_ae: <br />Budget - l--� <br />Utllitipc <br />Rich Mgr. <br />�= (0 <br />CONTRACTS w/H.R.HOLMAN FOR 20 ACRE SITE & 29 ACRE SITE ARE ON <br />FILE IN THE OFFICE OF CLERK TO THE BOARD. <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.