Laserfiche WebLink
Au e ems' 7 19 <br />BOOK 84 PA(HL �S, <br />approximately 1.98 million gallons per day. Therefore, the <br />established water level of service will be maintained with maximum <br />development of the subject property at its current zoned density. <br />Wastewater <br />Wastewater service is currently available to the subject property <br />from the City of Vero Beach. Based upon the site development <br />parameters referenced above, wastewater generation for the site <br />after development consistent with the existing RS -3 zoning would be <br />approximately 31 Equivalent Residential Units (ERUs), or 6,107 <br />gallons per day. This is based on the City of Vero Beach's adopted <br />level of service standard of 197 gallons per ERU per day. <br />Currently, the City of Vero Beach has a wastewater generation <br />capacity of 1.67 million gallons per day. This indicates that <br />wastewater capacity is adequate to accommodate the most intense use <br />of the subject property under the existing -RS -3 zoning. <br />- Solid Waste <br />Solid waste service includes pickup by private operators and <br />disposal at the county landfill. Solid waste generation by 31 <br />units of development on the subject property would be approximately <br />91.83 cubic yards of solid waste per year. This is based on the <br />county's adopted level of service standard of 2.37 cubic yards per <br />capita per year. A review of the solid waste capacity for the <br />active segment of the county landfill indicates the availability of <br />more than 900,000 cubic yards. -The active segment of the landfill <br />has a 4 year capacity, and the landfill has expansion capacity <br />beyond 2010. <br />Drainage <br />All development is reviewed for compliance with county stormwater <br />regulations which require on-site retention, preservation of flood <br />plain storage and minimum finished floor elevations. In addition, <br />development proposals will have to meet the discharge requirements <br />of the county Stormwater Management Ordinance. Since the subject <br />property is located within the B-1 Drainage Basin and no discharge <br />rate has been set for this basin, any development on the property <br />will be prohibited from discharging any runoff in excess of the <br />pre -development rate. <br />Based upon staff's analysis, the drainage level of service <br />istandards will be met by limiting off-site discharge to its pre - <br />development rate. <br />- Recreation <br />A review of county recreation facilities and the projected demand <br />that would result from the most intense development that could <br />occur on the property under the RS -3 zoning designations indicates <br />that adopted levels of service would be maintained.. The table <br />below illustrates the additional park demand associated with the <br />existing RS -3 zoning of the property and the existing surplus <br />acreage by park type. This indicates that no additional park space <br />would be needed, and the level of service would be maintained. <br />14 <br />L.O.S. <br />Project <br />(acres per 1000 <br />Demand <br />surplus <br />Park Type <br />population) <br />(acres) <br />Acreage <br />Urban <br />5 <br />.15 <br />196.01 <br />Community (South) <br />1.25 <br />'.03 <br />9.00 <br />Beach <br />1.5 <br />.04 <br />69.21 <br />River <br />1.5 <br />.04 <br />30.21 <br />As shown above, <br />the entire 11 <br />acre parcel could be developed to the <br />maximum extent <br />allowed by the <br />existing RS -3 zoning <br />of the subject <br />property, and public services <br />and facilities would <br />be adequate to <br />accommodate the <br />impacts. <br />14 <br />