My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/3/1991
CBCC
>
Meetings
>
1990's
>
1991
>
9/3/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:10 PM
Creation date
6/16/2015 10:38:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/03/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S� <br />�� BOOK 8 FN,UE i C <br />r _ <br />CDM <br />environmental engineers, scientists, <br />planners, & management consultants <br />July 30, 1991 <br />Mr. William F. McCain <br />Indian River County <br />1840 - 25th Street <br />Vero Beach, Florida 32960 <br />RE: North Beach Well <br />a <br />Dear Mr. McCain: <br />CAMP DRESSER & McKEE INC. <br />660 Beachland Boulevard, Suite 202 <br />Vero Beach, Florida 32963 <br />407 231.4301 Fax: 407 2314332 <br />AVG <br />-------- <br />CDM would be pleased to provide the services of a hydrogeologist. to assist <br />you in the completion of Well No. 3 at the North Beach site. The Scope of <br />Work would be as follows: <br />1 1991 <br />Task 1 Review the logs, construction documents, test results, and <br />construction activities that have been completed to date. Contact <br />the driller and the County for additional information as required. <br />This will take approximately 4 hours. <br />Task 2 On site, a hydrogeologist will assist you in witnessing the <br />completion of the well in 10 foot increments as proposed by the <br />driller. The hydrogeologist will provide technical consulting to you <br />during the drilling operation. However, since our hydrogeologist has <br />not been on-site during construction activities to date., he will not <br />take responsibility for the success or failure of the proposed <br />drilling operation and the hydrogeologist's work will be on a "best <br />effort" basis. We have budgeted two days of the hydrog6ologists time <br />for this task, including travel time. <br />A 72 -hour period for well development is scheduled between Task 2 and <br />3. Our hydrogeologist will not be on-site during this period. It is <br />our understanding that County personnel will witness the well <br />development. <br />Task 3 After the well is developed, the hydrogeologist will return to the <br />site and witness the step drawdown testing required by the <br />construction contract. We -have budgeted one day for this task. <br />Enclosed, as Attachment A, is the proposed project budget. We look forward <br />to working with you to complete this well as early as possible. If you have <br />any questions, please do not hesitate to contact our office. <br />Very truly yours, <br />CAMP DRESSER & McKEE INC. <br />A <br />William B. Suratt, P.E. <br />Associate <br />26 <br />s s <br />F7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.