My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/24/1991
CBCC
>
Meetings
>
1990's
>
1991
>
9/24/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:11 PM
Creation date
6/16/2015 10:43:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/24/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: SEPTEMBER 12, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED JAMES D. CHAS <br />AND STAFFED MANAGER OF AS*TY <br />PROJECTS <br />BY: DEPARTMENT OF SERVICES <br />SUBJECT: ANITA PARK - 38TH PLACE WATER SERVICE PROJECT <br />INDIAN RIVER COUNTY PROJECT NO. UWP 91 -05 -DS <br />PUBLIC HEARING, RESOLUTION NO. III <br />BACKGROUND <br />On September 30 1991, the Indian River County Board, of County <br />Commissioners approved Resolution I (91-103), which contained the <br />preliminary assessment roll describing the project and cost, and <br />Resolution II (91-104), setting the date of the public hearing for <br />the subject project. Propertyowners have been notified of the - <br />public hearing by certified mail. Resolution 91-103 was published <br />in the Vero Beach PRESS JOURNAL on September 9, 1991. (See attached <br />agenda item and minutes of the above meeting.) <br />ANALYSIS <br />Design of the water distribution system is complete. Approval of <br />the attached Resolution III will confirm and approve the preliminary <br />assessment. The attached map displays the area to benefit from the <br />assessment project. The project will serve the 30 lots bordering on <br />38th Place from Kings Highway/58th Avenue, east to 56th Avenue. The <br />petition for this service was signed by owners of 20, or 67%, of the <br />lots. <br />All of the lots in. this project are substandard or "undersized," <br />according to Indian River County's Comprehensive Plan, and the <br />County Public Health Unit, Division of Environmental Health, which <br />require that new lots utilizing well and septic systems be a minimum <br />of 1/2 acre. If served by a public water system, the lot may. be <br />reduced to .1/4 acre in size. Lots not meeting these minimum <br />standards are called "undersized lots." j <br />The total estimated cost to be assessed of $27,430.00..has been up- <br />dated, and the new. -amount is $27,388.12. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve Resolution III, which affirms <br />the preliminary assessment on the subject project. <br />Commissioner Scurlock inquired about the square footage <br />assessment, and Mr. Chastain advised that there was a slight <br />modification and he believed it is about 11.51 per sq. ft. <br />Commissioner Scurlock felt that was slightly on the upper <br />side, and Mr. Chastain noted that we have some slightly higher <br />and some a bit lower. This, however, is a preliminary assess- <br />ment and just an estimate until we actually put it out to bid. <br />Chairman Bird asked if anyone wished to be heard. <br />41 <br />l s' <br />SEP 2 1991 � Roo� `y � <br />
The URL can be used to link to this page
Your browser does not support the video tag.