Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
I <br />BOOK. 8,11 FrE? <br />The following table shows how these comprehensive plan amendments <br />are related to Future Land Use Policy 13.3. <br />Correct Correct an Change in <br />Mistake Oversight Circumstance <br />L.U. Policy: <br />1.23 X <br />1.35 X <br />1.36 X <br />1.19 X <br />2.4 X <br />4.3 X <br />S.S. & P.W: <br />_ <br />Connection Matrix X <br />Policies 5.9 & 6.1 X <br />CIE: <br />5 -Year CIP & other X <br />portions of the CIE <br />Other Plan Policies Consistent with Proposed Amendments <br />L.U. Policies: <br />1.23 <br />L.U.: Land Use Element S.S.: Sanitary Sewer Sub -Element <br />1.19, <br />1.20 <br />CIE: Capital Improvements P.W.: Potable Water Sub -Element <br />Element <br />L.U. <br />1.19, <br />1.20, <br />J <br />1.22, <br />1.23, 1.25 <br />.1._36 - <br />-.Essentially,all <br />of the proposed amendments except for the CIE <br />P P . A <br />=' <br />update., involve correcting an oversight. In fact, the Department. <br />1.20, <br />of Community Affairs actually recommended that several of these' <br />K 5. <br />1.23, <br />policies be amended. As described above, many of these changes are <br />,- <br />' , <br />not substantive in nature, but rather add clarity; reduce <br />1.21, <br />z <br />ambiguity, or eliminate confusion. In these cases, the intent is <br />1.25 <br />4.3 <br />to strengthen the plan by revising these policies <br />1.20, <br />1.21, <br />1.22, <br />1.23, <br />1.25 <br />Revisions to the 5 -year CIP and the CIE are necessary to reflect�� <br />changes in circumstances since plan adoption. - In that period since. <br />plan adoption, capital improvements have been completed; others. <br />have been added; revenue projections have changed, and priorities <br />have been modified. These circumstances warrant the amendment....: <br />g <br />- Consistency with Other Policies of the Plan <br />The table below lists those policies of the plan which are <br />consistent with each of the proposed comprehensive plan amendments. <br />Other Plan Policies Consistent with Proposed Amendments <br />L.U. Policies: <br />1.23 <br />L.U. <br />1.19, <br />1.20 <br />1.25 <br />1.35 <br />L.U. <br />1.19, <br />1.20, <br />1.21, <br />1.22, <br />1.23, 1.25 <br />.1._36 - <br />L.U. <br />31.7, <br />1.^0i u.2, 6.3 <br />1.19 <br />L.U. <br />1.20, <br />1.21, <br />1.22, <br />1.23, <br />1.25 <br />2.4 <br />L.U. <br />1.20, <br />1.21, <br />1.22, <br />1.23, <br />1.25 <br />4.3 <br />L.U. <br />1.20, <br />1.21, <br />1.22, <br />1.23, <br />1.25 <br />S.S.&P.W.: <br />Connection Matrix S.S. & P.W. 6.7, 6.9; L.U. 2.1, 2.2, 2.3 <br />Policies 5.9&6.1 S.S. & P.W. 6.2, 6.6, 6.9 <br />CIE: CIE 1.1, 1.2, 1.3, 1.4, 1.10, 1.11, 1.12 <br />As proposed, all of the amendments will retain the plan's internal <br />consistency. <br />20 <br />