Nov i2 1991
<br />PooK, 84 [;,,AIUF?
<br />AWARD OF BID _92-32,_CR_510_WABASSO_CAUSEWAY _BRIDGE _REPAIRS
<br />The Board reviewed the following memo dated 11/4/91:
<br />TO: James E. Chandler, _
<br />County Administrator
<br />FROM: James W. Davis, P.E.,
<br />Public Works Director T1
<br />a' SUBJECT: Award of Bid #92-32,
<br />CR510 Wabasso Causeway Bridge Repairs
<br />s DATE: November 4, 199:. FILE: wabasso.nov
<br />DESCRIPTION AND CONDITIONSwi
<br />Bids were received Oct. 23, 1991, for the Wabasso Causeway
<br />r31; Bridge Repair work. ; ,. The entire " timber fender system beneath
<br />...the bridge needs replacement and miscellaneous minor -items
<br />' need repair. The County's bridge consultant on ' this t.
<br />,:.project, Post, Buckley, Schuh, and Jernigan, Inc. (PBSJ)'
<br />r.'"Miami, FL, has estimated the cost! of :this work to be
<br />$579,500.
<br />'y° ALTERNATIVES AND ' ANALYSIS 'a'�`f Graaf
<br />' Letters were sent on,Oct. 3, 1991 to 23 contractors through.',0
<br />Florida notifying'- them of the project. In addition, the,;'
<br />project was advertised in the local newspaper. Only one bid
<br />a_ -,was received as follows : , ., ,,; w
<br />3 ��q A 4 • xlwn•,+>;.r•,
<br />r ; a Amount "T
<br />Bidder r , ;td,i��'} �r•j Brise Bid
<br />d i F fy 1 v y /�A•y�1 i� '
<br />i'
<br />1+�lyd"d •r� p AP''`S'•.�. rt•���li � �f.e .i���� �n�.
<br />Tom Quinn Company, Inc.
<br />f Palmetto, FL/Hobe Sound, FLS H$ ,Y `�°`h $ 628,158
<br />r-> ,, �N y ,:, t + r. • Ear •;�
<br />'y , ;, ;'r: --;7rycd : ` r . y .' ..7k ! t r fc' ° .ff r • ,. ,.t; ', . , , , ! ,y ,. ,4+
<br />iIN',,'On Oct. 16, " 1991,.the, Purchasing,.,Division.'. calledeight'..,.,
<br />•ten .of the* -bidders to inquire as. to, why they had. not picked;....?
<br />.`up "contract documents for this''work.';;:The contractors
<br />communicated various reasons as noted in the attached memo
<br />from Fran Boynton to Jim Davis dated Nov. 5,
<br />PBSJ has reviewed the bids, and .contacted various _'firms and
<br />government agencies to ' determine the contractor's.,
<br />qualifications and past performance. As a result of this -
<br />effort and the fact that only one bid. was. received, .the
<br />Consultant and County staff would normally recommend that
<br />the project be re -bid. However, the US Coast Guard Aids to
<br />Navigation Branch in Miami has informed the County that it
<br />is critical to replace the timber fender system as soon as
<br />possible. The timber structure is rapidly deteriorating and
<br />falling into the intracoastal waterway..: channel.
<br />Navigational lights on the fenders cannot be kept in working
<br />condition. This situation places the entire bridge in
<br />jeopardy if a large vessel wandered off course As recently
<br />happened in Fort Pierce. _
<br />The contractor has indicated that if the County disposes of
<br />the old timber structure, a substantial savings would
<br />.•result. Staff is trying to determine the amount of savings
<br />at this time.