My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/17/1992
CBCC
>
Meetings
>
1990's
>
1992
>
3/17/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:31 PM
Creation date
6/16/2015 11:19:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/17/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oA? , <br />BOCK 81" <br />) F,�IJE 841 <br />By terms of the agreement, liquidated damages can be charged to the <br />Contractor as he did not complete the project on time and does not <br />have a basis for an extension of time. The basis for an extension <br />of time is given by Florida Department of Transportation Standard <br />Specifications for Road & Bridge Construction 1986 (FDOT Standard <br />Specs.) referenced in, and made a part of the Contract documents, <br />Page GC -1, Section 3. The FDOT Standard Specs., Division .1, <br />Section 8-7.3.2, Page 69, allows extensions for conditions beyond <br />the control of the contractor not reasonably anticipated at the <br />time of making the bid, among other reasons. <br />On December 4, 1991, the county sent a certified letter to the <br />contractor advising him of our concern over meeting the schedule. <br />The contractor replied in writing to this letter with reasons for <br />his delay. (See his 12-10-91 letter). We respond to the four <br />enumerated reasons as follows: <br />1. This was verified by the County Projects Inspector. Staff <br />believes this is a valid reason for extension as given by FDOT <br />Standard Specs. 8-7.3.2 and recommends granting a seven (7) <br />day extension for this item. <br />2. This delay does not fit within the provision of 8-7.3.2, such <br />as being an area wide shortage, a strike, or natural disaster. <br />Staff recommends no time extension should be granted for this <br />item. <br />3. Removal of•extra end bent piles. The Contractor is required <br />to inspect the site for these kinds of problems. Some <br />anticipation of this work could have been anticipated by a <br />reasonably prudent -contractor in submitting his bid. Staff <br />recommends no time extension should be granted for this item. <br />4. This was clearly due to the contractor's own lack of internal <br />coordination. Staff recommends no time extension should be <br />given for this item. <br />Staff recommends a total time extension, within contract terms of <br />seven (7) days. The new contract time would be 157 calendar days. <br />Staff wants to make it clear that we are satisfied with the <br />Contractor's overall performance. His on-site personnel were very <br />cooperative and responsive. The workmanship and quality was <br />satisfactory and we would recommend the Contractor for future work <br />of this kind. Our recommendation is merely to enforce a material <br />term of the contract which the Contractor knowingly entered into. <br />In addition, the citizens of the county were required to take a <br />lengthy detour, school buses and emergency vehicles alike, while <br />this construction exceeded its completion date. Therefore, the <br />Board of County Commissioners would be justified in withholding <br />liquidated damages at the rate of $200.00 per day for the number of <br />days over the contract term used by the Contractor. The total <br />number of days the construction was overdue, allowing the above 7 <br />days, was 22 days, at $200.00 per day, or $4,400.00 liquidated <br />damages. The Contractor has been invited to this meeting to speak <br />to the Board to present his reasons why liquidated damages should <br />not be charged. <br />ALTERNATIVES AND ANALYSIS <br />Alternative No 1 - Approve the final pay request in the amount of <br />$456,352.51 and withhold $4,400.00 as liquidated damages for <br />failure to complete the project within 157 calendar days. <br />Alternative No 2 - Approve the final pay request and withhold no <br />liquidated damages. <br />RECOMMENDATION AND FUNDING <br />Staff recommends Alternative No. 1. <br />36 <br />M M. M <br />
The URL can be used to link to this page
Your browser does not support the video tag.