Laserfiche WebLink
Documents. ENGINEER will also have authority to <br />require special inspection or testing of the Work as <br />provided in paragraph 13.04, whether or not the Work <br />is fabricated, installed, or completed. <br />9.07 Shop Drawings, Change Orders and <br />Payments <br />A. In connection with ENGINEER's authority as <br />to Shop Drawings and Samples, see paragraph 6.17. <br />B. In connection with ENGINEER's authority as <br />to Change Orders; see Articles 10, 11, and 12. <br />C. In connection with ENGINEER's authority as <br />to Applications for Payment, see Article 14. <br />9.08 Determinations for Unit Price Work <br />A. ENGINEER will determine the actual quanti- <br />ties and classifications of Unit Price Work performed <br />by CONTRACTOR. ENGINEER will review with <br />CONTRACTOR the ENGINEER's preliminary <br />determinations on such matters before rendering a <br />written decision thereon (by recommendation of an <br />Application for Payment or otherwise). ENGINEER's <br />written decision thereon will be final and binding <br />(except as modified by ENGINEER to reflect changed <br />factual conditions or more accurate data) upon <br />OWNER and CONTRACTOR, subject to the <br />provisions of paragraph 10.05. <br />9.09 Decisions on Requirements of Contract <br />Documents and Acceptability of Work <br />A. ENGINEER will be the initial interpreter of the <br />requirements of the Contract Documents and judge of <br />the acceptability of the Work thereunder. Claims, <br />disputes and other matters relating to the acceptability <br />of the Work, the quantities and classifications of Unit <br />Price Work, the interpretation of the requirements of <br />the Contract Documents pertaining to the <br />performance of the Work, and Claims seeking <br />changes in the Contract Price or Contract Times will <br />be referred initially to ENGINEER in writing, in <br />accordance with the provisions of paragraph 10.05, <br />with a request for a formal decision. <br />B. When functioning as interpreter and judge <br />under this paragraph 9.09, ENGINEER will not show <br />partiality Jo OWNER or CONTRACTOR and will not <br />be liable in connection with any interpretation or <br />decision rendered in good faith in such capacity. The <br />rendering of a decision by ENGINEER pursuant to this <br />paragraph 9.09 with respect to any such Claim, <br />dispute, or other matter (except any which have been <br />waived by the making or acceptance of final payment <br />as provided in paragraph 14.07) will be a condition <br />precedent to any exercise by <br />CONTRACTOR of such rights or remedi <br />may otherwise have under the Contract D <br />by Laws or Regulations in respect of any <br />dispute, or other matter. <br />• <br />WNER or <br />-s as either <br />•cuments or <br />such Claim, <br />9.10 Limitations on ENGINEER's Aut ority and <br />Responsibilities <br />A. Neither ENGINEER's authority <br />sibility under this Article 9 or under any o <br />of the Contract Documents nor any decis <br />ENGINEER in good faith either to exe <br />exercise such authority or responsib <br />undertaking, exercise, or performance of <br />or responsibility by ENGINEER shall cre <br />or give rise to any duty in contract, tort, <br />owed by ENGINEER to CONTRACTOR, <br />tractor, any Supplier, any other individual <br />to any surety for or employee or agent of a <br />B. ENGINEER will not supervise, di <br />or have authority over or be res <br />CONTRACTOR's means, methods, tec <br />quences, or procedures of construction, <br />precautions and programs incident theret <br />failure of CONTRACTOR to comply wi <br />Regulations applicable to the perform <br />Work. ENGINEER will not be res <br />CONTRACTOR's failure to perform t <br />accordance with the Contract Documents. <br />or respon- <br />er provision <br />on made by <br />cise or not <br />lity or the <br />ny authority <br />te, impose, <br />r otherwise <br />ny Subcon- <br />or entity, or <br />y of them. <br />ect, control, <br />•nsible for <br />niques, se- <br />r the safety <br />or for any <br />Laws and <br />nce of the <br />onsible for <br />e Work in <br />ID <br />111 <br />C. ENGINEER will not be respon <br />acts or omissions of CONTRACTOR <br />Subcontractor, any Supplier, or of any oth <br />or entity performing any of the Work. <br />D. ENGINEER's review of the final <br />for Payment and accompanying documen <br />maintenance and operating instructions, <br />guarantees, Bonds, certificates of insp: <br />and approvals, and other documentation <br />be delivered by paragraph 14.07.A will <br />determine generally that their content c• <br />the requirements of, and in the case of c <br />inspections, tests, and approvals that <br />certified indicate compliance with, th <br />Documents. <br />E. The limitations upon authority and <br />ity set forth in this paragraph 9.10 shall <br />ENGINEER's Consultants, Resident Pr• <br />sentative, and assistants. <br />ible for the <br />or of any <br />-r individual <br />Application <br />tion and all <br />schedules, <br />tion, tests <br />required to <br />only be to <br />mplies with <br />rtificates of <br />the results <br />Contract <br />responsibil- <br />Iso apply to <br />ect Repre- <br />00700 - General Conditio s REV 5-10-13.doc <br />00700 - 29 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314107th Ave Milling_90th St to 94Th StAdmin \bid documents\Master Contract Documents\00700 - General Co <br />13.doc <br />ditions REV 5-10- <br />