Laserfiche WebLink
of the Work at the price bid and within the times and in accordance with the other terms and <br />conditions of the Bidding Documents; <br />G. become aware of the general nature of the work to be performed by OWNER and others <br />at the Site that relates to the Work as indicated in the Bidding Documents; <br />H. correlate the information known to Bidder, information and observations obtained from <br />visits to the Site, reports and drawings identified in the Bidding Documents, and all additional <br />examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; <br />I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br />resolution thereof by ENGINEER is acceptable to Bidder; and <br />J. determine that the Bidding Documents are generally sufficient to indicate and convey <br />understanding of all terms and conditions for the performance of the Work. <br />4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this Article 4, that without exception the Bid is <br />premised upon performing and furnishing the Work required by the Bidding Documents and <br />applying any specific means, methods, techniques, sequences, and procedures of construction <br />that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has <br />given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder <br />has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br />acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br />convey understanding of all terms and conditions for performing and furnishing the Work. <br />ARTICLE 5 - PRE-BID CONFERENCE <br />5.01 There will be no pre-bid meeting for this project. <br />ARTICLE 6 - SITE AND OTHER AREAS <br />6.01 The Site is identified in the Bidding Documents. All additional lands and access <br />thereto required for temporary construction facilities, construction equipment, or storage of <br />materials and equipment to be incorporated in the Work are to be obtained and paid for by <br />CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br />are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. <br />ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br />7.01 All questions about the meaning or intent of the Bidding Documents are to be <br />submitted to PURCHASING (purchasinqaircgov.com) in writing. Interpretations or clarifications <br />considered necessary by ENGINEER in response to such questions will be issued by Addenda <br />mailed or delivered to all parties through the Issuing Office as having received the Bidding <br />Documents. Questions received less than ten days prior to the date for opening of Bids may not <br />be answered. Only questions answered by Addenda will be binding. Oral and other <br />interpretations or clarifications will be without legal effect. <br />00200 - Instructions to Bidders REV 04-07.doc <br />00200 - 4 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th St\Admin\bid documents\Master Contract Documents\00200 - Instructions to <br />Bidders REV 04-07.doc Rev. 05/01 <br />