My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to discuss and coordinate work. <br />B. Per the FDOT Standard Specifications for Road and Bridge Constructs n, the <br />Contractor will certify to the Engineer the following: <br />1. A listing of on-site clerical staff, supervisory personnel and their pr -rated <br />time assigned to the contract, <br />2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br />3. Existence of employee benefit plan for Holiday, Sick and Vacation enefits <br />and a Retirement Plan, and, <br />4. Payment of Per Diem is a company practice for instances when <br />compensation for Per Diem is requested. <br />Such certification must be made by an officer or director of the Contrac or with <br />authority to bind the Contractor. Timely certification is a condition prece ent to <br />any right of the Contractor to recover compensations for such costs, an failure <br />to timely submit the certification will constitute a full, complete, absol to and <br />irrevocable waiver by the Contractor of any right to recover such cost . Any <br />subsequent changes shall be certified to the Engineer as part of t e cost <br />proposal or seven calendar days in advance of performing such extra wor <br />FDOT Table 4-3.2.1 <br />Item <br />Rate <br />FICA <br />Rate established by Law <br />FUTA/SUTA <br />Rate established by La <br />Medical Insurance <br />Actual <br />Holidays, Sick & Vacation Benefits <br />Actual <br />Retirement Benefits <br />Actual <br />Workers Compensation <br />Rates based on the National Co ncil on <br />Compensation Insurance basic ra es tables <br />adjusted by Contractor's actual e perience <br />modification factor in effect at the ime of the <br />additional work or unforeseen work <br />Per Diem <br />Actual but not to exceed State of Fl.rida's rate <br />Insurance* <br />Actual <br />*Compensation for Insurance is limited solely to General Liability Coverage and does not incluse any other <br />insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, eta.). <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as <br />1. Written Interpretations <br />2. Addenda <br />3. Specifications <br />4. Supplementary Conditions to the General Conditions <br />5. General Conditions <br />6. Approved Shop Drawings <br />7. Drawings <br />8. Referenced Standards. <br />B. Written/computed dimensions shall govern over scaled dimensions. <br />00800-2 <br />00800 - Supplementary Conditions 0 <br />00800 2F:\ Public Works\ENGINEERING DIVISION PROJECTS11314-107th Ave Milling_90th St to 94th S8Admin\bid documents\Master Contract Documents <br />oilows: <br />13 rev.doc <br />eaoo- <br />Il <br />
The URL can be used to link to this page
Your browser does not support the video tag.