My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: Vero Lake Estates Asphalt Millings Project (Phase I) <br />Project No:1314 <br />Bid No: 2015010 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />Q Unit Prices <br />0 Lump Sum <br />D Other: <br />II By Change Order: <br />II Contractor's Records <br />II Engineer's Records <br />II Other: <br />Q By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />RECOMMENDED: <br />By: <br />ENGINEER (Signature) <br />Date: <br />**END OF SECTION** <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th StWdmin\bid documents\Master <br />Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.