My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01009 <br />SPECIAL PROVISIONS <br />1.1 GENERAL <br />A. Visits to the construction site may be made by representatives of permi ing or <br />governing bodies. Submit details of all instructions from the above to the <br />ENGINEER immediately. The Work will not be accepted by the OWNER u til final <br />acceptance has been received from the various Regulatory Agencies having <br />jurisdiction. <br />B. Furnish sufficient labor, construction equipment and materials, and wo k such <br />hours, including night shifts and overtime operations, as may be necessary to insure <br />the prosecution of the work in accordance with the approved progress sche. ule. If, <br />in the opinion of the ENGINEER, the CONTRACTOR falls behind the p ogress <br />schedule, take such steps as may be necessary to improve progress, all ithout <br />additional cost to the OWNER. The ENGINEER shall be compensated for his <br />overtime services in accordance with the Supplementary Conditions, SC -6.02. <br />C. All salvageable material and equipment for which specific use, relocation <br />disposal is not specifically noted, shall remain the property of the OWNER a <br />be delivered to the OWNER at the following location: 4550 41st Street, <br />CONTRACTOR's expense. All material and equipment not in salv <br />condition, as determined by the ENGINEER and the OWNER, shall be disp <br />by the CONTRACTOR, at the CONTRACTOR's expense. <br />r other <br />d shall <br />at the <br />geable <br />• sed of <br />D. In addition to these Specifications all work must comply with the requiremen s of the <br />local governing agency, St. Johns River Water Management District, Depart ent of <br />Environmental Protection, Army Corps of Engineers, and all other applicabl- State <br />or Federal agencies' specifications and permits. In the event of a conflict, t e more <br />stringent specification or requirement shall govern. <br />E. Before performing any work outside the designated limits of the work site, secure <br />any necessary permits and authorization from the applicable owner, or erify in <br />writing that such has been previously obtained. Follow all requirements of any said <br />permits or authorization. Give the ENGINEER and appropriate owner ten (1 ) days <br />minimum notice before commencing construction operations outside the des gnated <br />limits of the work site. <br />01009-1 01009 -Special Provisions <br />F:\PublicWorksENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th St\Admin\bid documents\Master Con ract <br />Documents\01009 - Special Provisions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.