My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01050 <br />FIELD ENGINEERING AND LAYOUT <br />1.1 GENERAL <br />A. The CONTRACTOR will furnish all construction staking for the project. II <br />staking from control will be under the supervision of a Florida Registered Land <br />Surveyor. <br />B. Develop and make all detail surveys and measurements needed for <br />construction including but not limited to, slope stakes, batter boards, pili g <br />layouts and all other working lines, elevations and cut sheets. <br />C. Keep a transit and leveling instrument on the site at all times and a skille <br />instrument man available whenever necessary for layout of the Work. <br />D. Provide all material required for benchmarks, control points, batter board <br />grade stakes, and other items. <br />E. Be solely responsible for all locations, dimensions and levels. No data o her <br />than written orders of the ENGINEER shall justify departure from the <br />dimensions and levels required by the Drawings. <br />F. Safeguard all points, stakes, grademarks, monuments and benchmarks ade <br />or established on the Work, and reestablish same, if disturbed. Rectify .II <br />Work improperly installed because of not maintaining, not protecting or <br />removing without authorization such established points, stakes, marks a d <br />monuments. <br />G. When requested by the ENGINEER, provide such facilities and assistanIe as <br />may be necessary for the ENGINEER to check line and grade points pla ed by <br />the CONTRACTOR. Do no excavation or embankment work until all <br />cross -sectioning necessary for determining pay quantities has been com•leted <br />and checked by the ENGINEER. <br />H. The cost of performing engineering and layout work described above sh _ II be <br />included in the contract unit prices for the various items of work to which it is <br />incidental. No separate payment will be made for surveying or engineeri g. <br />1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br />A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the <br />accuracy of all survey and existing site information as indicated in the Contract <br />Documents. Immediately notify the ENGINEER upon discovery of any e rors, <br />inaccuracies or omissions in the survey data. The commencing of any o the <br />work by the CONTRACTOR shall be held as the CONTRACTOR's acce•tance <br />that all survey or existing site information is correct and accurate, withou any <br />reasonably inferable errors, inaccuracies or omissions. <br />1050-1 01050 Field Engineering <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11314-107th Ave Milling 90th St to 94th St\Admin\bid documents\Master Contract Documents \01050 - Fie d <br />Engineering.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.