Laserfiche WebLink
01340 — Submittal of Shop Drawings <br />1.5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br />DRAWINGS, PRODUCT DATA AND SAMPLES <br />A. The CONTRACTOR's responsibilities for submittal of shop drawing <br />product data, and samples are set forth in paragraph 6.17 of the G <br />Conditions and as further explained herein. <br />neral <br />B. Prior to submission, thoroughly check shop drawings, product data, and <br />samples for completeness and for compliance with the Contract <br />Documents, verify all dimensions and field conditions, and coordin.te the <br />shop drawings with the requirements for other related work. Also re iew <br />each shop drawing before submitting it to the ENGINEER to deter ine <br />that it is acceptable in terms of the means, methods, techniques, <br />sequences and operations of construction, safety precautions and <br />programs incidental thereto, all of which are the CONTRACTOR's <br />responsibility. <br />1. It is CONTRACTOR'S responsibility to review submittals ma e by <br />his suppliers and Subcontractors before transmitting them to <br />ENGINEER to assure proper coordination of the Work and t• <br />determine that each submittal is in accordance with its desir:s and <br />that there is sufficient information about materials and equip ent <br />for ENGINEER to determine compliance with the Contract <br />Documents. <br />2. Incomplete or inadequate submittals will be returned for rev! ion <br />without review. <br />0 <br />C. The CONTRACTOR's responsibility for errors and omissions in sub ittals <br />is not relieved by the ENGINEER's review of submittals. The <br />CONTRACTOR shall approve the shop drawings based on his in-th--field <br />measurements, prior to submittal to the ENGINEER for his review. <br />D. Notify the ENGINEER, in writing at the time of submission, of devia ions in <br />submittals from the requirements of the Contract Documents. The <br />CONTRACTOR's responsibility for deviations in submittals from the <br />requirements of the Contract Documents is not relieved by the <br />ENGINEER's review of submittals, unless the ENGINEER gives wri en <br />acceptance of specific deviations. <br />E. Begin no work, which requires submittals until return of submittals ith the <br />ENGINEER's stamp and initials or signature indicating the submittal has <br />been reviewed. <br />01340 - Submittal of Shop Dr-wings.doc <br />01340-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th St\Admin\bid documents\Master Contract <br />Documents\01340 - Submittal of Shop Drawings.doc <br />