|
SECTION 01541
<br />PROTECTION OF THE WORK AND PROPERTY
<br />1.1 GENERAL
<br />A. CONTRACTOR shall be responsible for taking all precautions, providing a I
<br />programs, and taking all actions necessary to protect the Work and all pu • lic
<br />and private property and facilities from damage as specified in the Genera
<br />Conditions and herein.
<br />B. In order to prevent damage, injury or loss, CONTRACTOR'S actions shall
<br />include, but not be limited to, the following:
<br />1. Store apparatus, materials, supplies, and equipment in an orderly, sa e
<br />manner that will not unduly interfere with the progress of the Work or he
<br />Work of any other Contractor or utility service company.
<br />2. Provide suitable storage facilities for all materials, which are subject t injury
<br />by exposure to weather, theft, breakage, or otherwise.
<br />3. Place upon the Work or any part thereof, only such loads as are con istent
<br />with the safety of that portion of the Work.
<br />4. Clean up frequently all refuse, rubbish, scrap materials, and debris c- used
<br />by construction operations, so that at all times, the site of the Work p esents
<br />a safe, orderly, and workmanlike appearance.
<br />5. Provide barricades and guard rails around openings, for scaffolding, • r
<br />temporary stairs and ramps, around excavations, elevated walkways : nd
<br />other hazardous areas.
<br />C. Except after written consent from proper parties, do not enter or occupy
<br />privately -owned land with men, tools, materials or equipment, except on
<br />easements provided herein.
<br />D. Assume full responsibility for the preservation of all public and private pro
<br />facility on or adjacent to the site. If any direct or indirect damage is done
<br />on account of any act, omission, neglect or misconduct in the execution o
<br />Work by the CONTRACTOR, it shall be restored by the CONTRACTOR,
<br />expense, to a condition equal to or better than that existing before the da
<br />was done.
<br />11
<br />erty or
<br />y or
<br />the
<br />t its
<br />age
<br />1.2 BARRICADES AND WARNING SIGNALS
<br />Where Work is performed on or adjacent to any roadway, right-of-way, or publ c
<br />place, provide barricades, fences, lights, warning signs, danger signals, and
<br />watchmen, and take other precautionary measures for the protection of perso s or
<br />property and of the Work. Paint barricades so they are visible at night. From .unset
<br />to sunrise, furnish and maintain at least one light at each barricade. Erect su 'icient
<br />barricades to keep vehicles from being driven on or into Work under construction.
<br />Furnish watchmen in sufficient numbers to protect the Work. CONTRACTOR'
<br />responsibility for the maintenance of barricades, signs, lights, and for providin
<br />watchmen shall continue until OWNER accepts the Project.
<br />0
<br />01541-1 F:\Public Works\ENGINEERING DIVISION
<br />PROJECTS \1314 -107th Ave Miiling_90th St to 94th St\Admin\bid documents\Master Contract
<br />Documents\01541 - Protection of Property.doc
<br />
|