My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01610 <br />TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br />1.1 GENERAL <br />A. Make all arrangements for transportation, delivery and handling of equipm-n <br />and materials required for prosecution and completion of the Work. <br />B. Shipments of materials to CONTRACTOR or Subcontractors shall be deli ered <br />to the site only during regular working hours. Shipments shall be address -d and <br />consigned to the proper party giving name of Project, street number and c ty. <br />Shipments shall not be delivered to OWNER except where otherwise dire ted. <br />C. If necessary to move stored materials and equipment during construction, <br />CONTRACTOR shall move or cause to be moved materials and equipme t <br />without any additional compensation. <br />1.2 DELIVERY <br />A. Arrange deliveries of products in accord with construction schedules and i <br />ample time to facilitate inspection prior to installation. <br />B. Coordinate deliveries to avoid conflict with Work and conditions at site an <br />accommodate the following: <br />1. Work of other contractors, or OWNER. <br />2. Limitations of storage space. <br />3. Availability of equipment and personnel for handling products. <br />4. OWNER'S use of premises. <br />11 <br />t <br />C. Do not have products delivered to project site until related Shop Drawings have <br />been approved by the ENGINEER. <br />D. Do not have products delivered to site until required storage facilities hav: been <br />provided. <br />E. Have products delivered to site in manufacturer's original, unopened, lab led <br />containers. Keep ENGINEER informed of delivery of all equipment to be <br />incorporated in the Work. <br />01610-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling_90th St to 94th St\Admin\bid documents\Mast=rContract <br />Documents\01610 - Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.