My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Samples, if appropriate. <br />d. Name and address of similar projects on which product was sed, <br />and date of installation. <br />2. For construction methods (if specified): <br />a. Detailed description of proposed method. <br />b. Drawings illustrating method. <br />3. Such other data as the ENGINEER may require to establish that he <br />proposed substitution is equal to the product, manufacturer or m:thod <br />specified. <br />C. In making Request for Substitution, CONTRACTOR represents that: <br />1. CONTRACTOR has investigated proposed substitution, and det: r - <br />mined that it is equal to or superior in all respects to the product, <br />manufacturer or method specified. <br />2. CONTRACTOR will provide the same or better guarantees or <br />warranties for proposed substitution as for product, manufacturer, or <br />method specified. <br />3. CONTRACTOR waives all claims for additional costs or extensio of <br />time related to a proposed substitution that subsequently may be ome <br />apparent. <br />D. A proposed substitution will not be accepted if: <br />1. Acceptance will require changes in the design concept or a subst: ntial <br />revision of the Contract Documents. <br />2. It will delay completion of the Work, or the work of other contract u rs. <br />3. It is indicated or implied on a Shop Drawing and is not accompan ed by <br />a formal Request for Substitution from CONTRACTOR. <br />E. If the ENGINEER determines that a proposed substitute is not equal to th t <br />specified, furnish the product, manufacturer, or method specified at no adoitional <br />cost to OWNER. <br />F. Approval of a substitution will not relieve CONTRACTOR from the require ent <br />for submission of Shop Drawings as set forth in the Contract Documents. <br />G. The procedure for review by Engineer will include the following: <br />1. Requests for review of substitute items of material and equipment ill <br />not be accepted by Engineer from anyone other than CONTRAC OR. <br />2. Upon receipt of an application for review of a substitution, Engine:r will <br />determine whether the review will be more extensive than a norm.l shop <br />drawing review for the specified item. <br />3. If the substitution will not require a more extensive review, Engine -r will <br />proceed with the review without additional cost to CONTRACTOR. <br />01630-2 01630 Substitutio s <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th St'Admin\bid documents\Mas r Contract <br />Documents\01630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.