My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br />SITE CLEANUP AND RESTORATION <br />1.1 SCOPE <br />Furnish all labor, equipment, appliances, and materials required or necessary to <br />clean up and restore the site after the construction is completed. <br />1.2 REQUIREMENTS <br />A. During the progress of the project, keep the work and the adjacent : reas <br />affected thereby in a neat and orderly condition. Remove all rubbis , <br />surplus materials, and unused construction equipment. Repair all <br />damage so that the public and property owners will be inconvenien.ed as <br />little as possible. <br />B. Provide onsite containers for the collection of waste materials, debr s, and <br />rubbish and empty such containers in a legal manner when they be ome <br />full. <br />C. Where material or debris has been deposited in watercourses, ditc es, <br />gutters, drains, or catch -basins as a result of the CONTRACTOR's <br />operations, such material or debris shall be entirely removed and <br />satisfactorily disposed of during the progress of the work, and the d tches, <br />channels, drains, etc., shall be kept clean and open at all times. <br />D. Before the completion of the project, unless otherwise especially di ected <br />or permitted in writing: <br />1. Tear down and remove all temporary buildings and structure., <br />2. Remove all temporary works, tools, and machinery, or other <br />construction equipment furnished; <br />3. Remove all rubbish from any grounds occupied; and <br />4. Leave the roads, all parts of the premises, and adjacent pro•erty <br />affected by construction operations, in a neat and satisfacto <br />condition. <br />E. Restore or replace any public or private property damaged by const uction <br />work, equipment, or employees, to a condition at least equal to that <br />existing immediately prior to the beginning of the operations. To thiend, <br />the CONTRACTOR shall restore all highway, roadside, and landscping <br />work within any right-of-way, platted or prescriptive. Acceptable ma erials, <br />equipment, and methods shall be used for such restoration. <br />F Thoroughly clean all materials and equipment installed and on com <br />of the work, deliver the facilities undamaged and in fresh and new - <br />appearing condition. <br />1 <br />letion <br />01710 Si e Cleanup <br />01710-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling_90th St to 94th St'Admin\bid documents\Master Contract <br />Documents\01710 - Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.