Laserfiche WebLink
SECTION -102 - MAINTENANCE OF TRAFFIC <br />The work specified in this item shall conform to Section 102 of the Florida De•artment of <br />Transportation Standard Specifications for Road and Bridge Construction (2014 Edition), <br />except as modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Secti <br />of maintaining traffic within the limits of the project for the duration of the c <br />period, including any temporary suspensions of the work. It shall i <br />construction and maintenance of any necessary detour facilities; the p <br />necessary facilities for access to residences, businesses, etc., along the <br />furnishing, installing and maintaining of traffic control and safety devi <br />construction, the control of dust through the use of calcium chloride if nec <br />any other special requirements for safe and expeditious movement of traffi <br />called for on the plans. The term, Maintenance of Traffic, as used herein, s <br />all of such facilities, devices and operations as are required for the <br />convenience of the public as well as for minimizing public nuisance; all as <br />this Itemized Section 14 of these provisions and Paragraph 24 in General <br />Section. <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Cont <br />present his Maintenance of Traffic Plan at the pre -construction confer <br />Maintenance of Traffic Plan shall indicate the type and location of all si <br />barricades, striping and barriers to be used for the safe passage of pede <br />vehicular traffic through the project and for the protection of the workmen <br />will indicate conditions and setups for each phase of the Contractor's acti <br />When the project plans include or specify a specific Maintenance of T <br />alternate proposals will be considered when they are found to be equal <br />than the plan specified. <br />• n consists <br />nstruction <br />clude the <br />oviding of <br />roject; the <br />es during <br />ssary, and <br />as may be <br />all include <br />afety and <br />pecified in <br />Conditions <br />• <br />actor shall <br />nce. The <br />• ns, lights, <br />.trians and <br />. The plan <br />ities. <br />affic Plan, <br />o or better <br />In no case may the Contractor begin work until the Maintenance of Traff c Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br />Plan that become necessary shall also be approved in writing. Ex ept in an <br />emergency, no changes to the approved plan will be allowed until approval to change <br />such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be inc uded in the <br />pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installa ions on the <br />project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised oft e schedule <br />of these inspections and be given the opportunity to join in the inspection ais deemed <br />necessary. <br />C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards or Design, <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />Edition as dated on the plans set forth the basic principles and prescribeminimum <br />standards to be followed in the design, application, installation, maintenance and <br />removal of all traffic control devices and all warning devices and barrier • which are <br />01025-2 Technical Specifi tions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Millina 90th St to 94th St\Admin\bid documents Master Contract <br />