Laserfiche WebLink
SECTION - 570 — PERFORMANCE TURF <br />The work specified in this item shall conform to Section 570 of the Florida Depa ment of <br />Transportation Standard Specifications for Road and Bridge Construction (2014). <br />A. Description: Sod for the project shall be of the variety that is common to th <br />of a variety approved by the Engineer. This work shall also include mo <br />mowed at maximum 6" height with a mulching mower. <br />B. Work Included: Scope of Work: The work specified in this section cons <br />establishing of a stand of grass, within the project, right-of-way, easements <br />areas indicated on the Drawings, by furnishing and placing grass sod. Als <br />are fertilizing, watering and maintenance as required to assure a health <br />grass.Two applications of fertilizer will be required with the initial applic. <br />fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for one year after d. <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less tha <br />square) indication of probable non survival or lack of health and vigor, or w <br />exhibit the characteristics to meet specifications, shall be replaced within <br />notice from Owner or Engineer. All replacement sod shall be furnished/inst <br />additional cost to the Owner and shall be guaranteed for three months. All re <br />shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the <br />guarantee period and such guarantee shall be extended until notification i <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory g <br />be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River Count <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendi <br />E. Water for Grassing: Contractor shall provide the water used in th <br />operations as necessary to meet the requirements of Article 570-3.6. <br />F Preparation of Ground: The area over which the sod is to be place <br />scarified or loosened to a depth and then raked smooth and free from deb <br />the soil is sufficiently loose and clean, the Owner, at his discretion, may au <br />elimination of ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be br <br />range of 6.0-7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and <br />application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 4 <br />per acre, or 10 pounds per 1,000 square feet, by a spreading device <br />uniformly distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All t <br />bags shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mi <br />practicable, the fertilizer shall be spread by hand and raked in and thorou <br />with the soil to a depth of approximately 2 inches. <br />01025-18 Technical Specific <br />- <br />F \P"hlir. Wr rkc\FNrINFFRING fIVISInN PRO.IFCTS\1314-107th Ave Millina 90th St to 94th St\Admin\bid documents <br />4 <br />area and <br />ing, to be <br />ists of the <br />and other <br />• included <br />stand of <br />tion being <br />to of final <br />95% of a <br />ich do not <br />• weeks of <br />lied at no <br />lacement <br />nd of the <br />received. <br />owth shall <br />Fertilizer <br />B). <br />sodding <br />shall be <br />is. Where <br />horize the <br />ught to a <br />he second <br />6 pounds <br />apable of <br />ckets from <br />ing is not <br />hly mixed <br />tions <br />aster Contract <br />