My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION - 02670 FLUSHING TESTING AND DISINFECTING <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Flushing, Pressure Testing, and Disinfection of all piping systems. <br />B. Contractor shall furnish all necessary pumps, hoses, piping, fitting <br />gauges, chemicals and labor to conduct specified testing. <br />C. Testing shall be repeated at the Contractor's expense until satisfactory <br />achieved. <br />D. Refer the specific chemical system specification section for additional fl <br />testing procedures. <br />1.02 RELATED REQUIREMENTS SPECIFIED ELSEWHERE <br />A. Section 1000 — Water and Sewer Utilities <br />, meters, <br />esults are <br />shing and <br />1.03 REFERENCES <br />A. ANSI/AWWA C651 - Standard for Disinfecting Water Mains. <br />1.04 SUBMITTALS <br />A. Test Reports: Indicate results comparative to specified requiremen's. Submit <br />two (2) copies of test results to Engineer in accordance with Submittal <br />specifications. <br />1.05 QUALITY ASSURANCE <br />A. Perform Work in accordance with ANSI/AWWA C651. <br />1.06 REGULATORY REQUIREMENTS <br />A. Conform to applicable Florida DEP requirements for performing the work of <br />this Section. <br />B. Work shall conform to Indian River County Standards. <br />PART 2 - PRODUCTS <br />2.01 DISINFECTION CHEMICALS <br />A. Chemicals: The disinfecting agent shall be sodium hypochlori e solution <br />ANSI/AWWA B303 or liquid chlorine ANSI/AWWA B301. Dry h pochlorite, <br />similar to "HTH" or equal may also be used as the disinfecting ag - nt. <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. Verify that piping systems have been cleaned, inspected, and test: d. <br />B. Coordinate scheduling of flushing, pressure testing, and disinfect'• <br />with tie-ins, certifications, and sequence of construction. <br />3.02 FLUSHING AND PRESSURE TESTING - PIPING <br />A. The Contractor shall furnish and install suitable temporary testing plug <br />the water lines, all necessary pressure pumps, hose, pipe connecti• <br />gauges and other similar equipment, and all labor required, all witho <br />compensation for conducting pressure and leakage tests and flu <br />piping. Flushing and pressure testing shall be conducted in the foll• <br />B. After all piping lines have been installed and before pressure testing, <br />pipe shall be thoroughly flushed so as to remove all debris and for <br />01025-22 Technical Specifi <br />rAn.,6.io..,A,...1...\mor•inimcoinir_ nix/telt-v.1 Dort Icr^TC\9/A A 1/ 7th 4..e. AAfllir.. Orlth Cf to OAth C+\Arin,ir.\hid rinrnn,ente <br />n activities <br />or caps for <br />ns, meters, <br />t additional <br />hing of the <br />wing order. <br />-ach run of <br />-ign matter <br />ations <br />PAactcr rnntra -t <br />
The URL can be used to link to this page
Your browser does not support the video tag.