My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM No. 1 <br />November 20, 2014 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: VERO LAKE ESTATES ASHPALT MILLINGS PROJECT (PHASE I) <br />IRC PROJECT NO.IBID NO.: 131412015010 <br />BIDDER'S NAME: Dickerson Florida, Inc . <br />Item No. <br />Description <br />Quantity <br />Unit. <br />Unit Price ;. <br />Amount <br />711-35-241 <br />SOLID TRAFFIC STRIPE (24") (THERMOPLASTIC) <br />456 <br />LF <br />3 . 5 0 <br />15 9 6. 0 0 <br />1644-800 <br />FIRE HYDRANT (RELOCATE) <br />1 <br />EA <br />1800.0C <br />1800.00 <br />ROADWAY IMPROVEMENTS SUB TOTAL <br />678, 000.00 <br />MISCELLANEOUS <br />801 <br />TRENCH SAFETY COMPLIANCE (OVER 5') (SEE SEC. <br />00454) <br />1 <br />LS <br />10 0. 0 0 <br />100.00 <br />802 <br />TRENCH SAFETY COMPLIANCE (SHORING) (SEE SEC. <br />00454) <br />1 <br />LS <br />10 0. 0 0 <br />100.00 <br />803 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />44 0 0. 0 C <br />4400.00 <br />FA -1 <br />FORCE ACCOUNT <br />1 <br />LS <br />30,000.00 <br />30,000.00 <br />MISCELLANEOUS SUB TOTAL <br />34,600.00 <br />OVERALL PROJECT TOTAL <br />712, 600.00 <br />• Indicates change from original Itemized Bid Schedule <br />TOTAL PROJECT BID AMOUNT (IN WORDS): seven hundred twelve thousand six hundred <br />dollars and no cents <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton PI = Per Installation <br />CY = Cubic Yards AS = Assembly LBS = Pounds AC = Acre <br />003104 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11314-107th Ave Milling_90th St to 94th SMdminWddendumlitemized Bid Schedule Addendum No. 1 11-20-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.