CLARIFICATIONS: <br />1. Bid Item 110-1-1 "Clearing & Grubbing" has been revised from Quantity 1, Lump Sum, to Quantity <br />15.30, Acres. Please see attached revised Itemized Bid Schedule and revised Plan Sheet 4 of 34 <br />(Summary of Quantities). <br />2. Contractor is directed to clear and grub 107th Avenue and install silt fence at Right of Way lines as <br />the first work effort. Contractor is to move out of this area and allow a (IRC Utilities) Contractor to <br />install a water main along the west side of 107th Avenue. <br />Contractor is also required to backfill and level areas of clearing to allow construction equipment <br />easy access to the site for installation of the water main by IRC Utilities Contractor. The IRC <br />Utilities Contractor will maintain the silt fence during their water main installation time frame <br />(estimate time for water main installation is 30 calendar days). <br />QUESTIONS AND ANSWERS: <br />QUESTION NO. 1 <br />There are two type "C" inlets and one type "E" inlet that I do not find on the bid form. Will these items be <br />added? <br />ANSWER NO. 1 <br />Itemized Bid Schedule has been revised. Please see attached revised Itemized Bid Schedule and revised <br />Plan Sheet 4 of 34 (Summary of Quantities). <br />QUESTION NO. 2 <br />What is our responsibility regarding the brick paver driveways? <br />ANSWER NO. 2 <br />Contractor shall notify the homeowner and have homeowner remove brick pavers from R/W. <br />shall give homeowner adequate time to have them removed (minimum 30 calendar days). <br />Page 2 of 4 <br />F:1Public WorkstENG[NEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th St\Admin\Addendum\Addendum No. 1 11-20-2014.doc <br />Contractor <br />