Laserfiche WebLink
Page 4 of 6 <br />CERTIFICATION OF ENGINEER: <br />I certify that I have reviewed the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it appears to be a easonably <br />accurate statement of the work performed and/or material supplied by the Contr. ctor. I am <br />not certifying as to whether or not the Contractor has paid all subcontractor, laborers, <br />materialmen and suppliers because I am not in a position to accurately det-rmine that <br />issue. <br />Dated <br />SIGNATURE <br />CERTIFICATION OF INSPECTOR: <br />I have checked the estimate against the Contractor's Schedule of Amounts f <br />Payments and the notes and reports of my inspections of the project. To the <br />knowledge, this statement of work performed and/or materials supplied app <br />reasonably accurate, that the Contractor appears to be observing the requirem <br />Contract with respect to construction, and that the Contractor should be paid t <br />requested above, unless otherwise noted by me. I am not certifying as to whe <br />the Contractor has paid all subcontractors, laborers, materialmen and suppliers <br />am not in a position to accurately determine that issue. <br />Dated <br />r Contract <br />est of my <br />ars to be <br />nts of the <br />e amount <br />her or not <br />because I <br />SIGNATURE <br />******************************************************************************************** ****** <br />[The Remainder of This Page Was Left Blank Intentionally] <br />00622 - Contractors Application for Paymen <br />- 03-10 rev.doc <br />00622 - 4 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling 90th St to 94th St\Admin\bid documents\Master Contract Documents\00622 - Cor tractor's Application <br />for Payment - 03-10 rev.doc Rev. 05/01 <br />