My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project No.: 1314 <br />Project Description: Vero Lake Estates Asphalt Millings Project (Phase I) <br />Bid No. 2015010 <br />CONTRACT FOR: Vero Lake Estates Asphalt Millings Project (Phase I) <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents <br />to the following specified parts thereof: <br />or <br />To. <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared <br />of <br />to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may of be all- <br />inclusive, and the failure to include an item in it does not alter the respon ibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Docume ts. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within days <br />of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion RSV 04-07.doc <br />00630 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling_90th St to 94th St'Admin\bid documents\Master Contract Documents\00630 - Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.