My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereby; however, CONTRACTOR shall not be liable <br />to OWNER or ENGINEER for failure to report any <br />conflict, error, ambiguity, or discrepancy in the <br />Contract Documents unless CONTRACTOR knew or <br />reasonably should have known thereof. <br />B. Preliminary Schedules: Within ten days after <br />the Effective Date of the Agreement (unless otherwise <br />specified in the General Requirements), CONTRAC- <br />TOR shall submit to ENGINEER for its timely review: <br />1. a preliminary progress schedule <br />indicating the times (numbers of days or dates) <br />for starting and completing the various stages <br />of the Work, including any Milestones specified <br />in the Contract Documents; <br />2. a preliminary schedule of Shop <br />Drawing and Sample submittals which will list <br />each required submittal and the times for sub- <br />mitting, reviewing, and processing such <br />submittal; and <br />3. a preliminary schedule of values for <br />all of the Work which includes quantities and <br />prices of items which when added together <br />equal the Contract Price and subdivides the <br />Work into component parts in sufficient detail to <br />serve as the basis for progress payments <br />during performance of the Work. Such prices <br />will include an appropriate amount of overhead <br />and profit applicable to each item of Work. <br />the Site is started, CONTRACTOR and OWNE; all <br />each deliver to the other, with copi o each <br />additional insured identified in ti - upplementary <br />Conditions, certificates of ' urance (and other <br />evidence of insuranc- ich either of them or any <br />additional insur-, may reasonably request) which <br />CONTRA • ' and OWNER respectively are <br />2.06 Preconstruction Conference <br />to run, but before any Wo <br />conference <br />ite is started, a <br />y CONTRACTOR, ENGINEER, <br />as appropriate will be held to establish a <br />and other submittals, processing Applications for <br />2.07 Initial Acceptance of Schedules <br />A. Unless otherwise provided in t e Contract <br />Documents, at least ten days before submission of the <br />first Application for Payment a conference <br />CONTRACTOR, ENGINEER, and others <br />ate will be held to review for acceptabili <br />NEER as provided below the schedules <br />accordance with paragraph 2.05.B. CO <br />shall have an additional ten days to mak: <br />and adjustments and to complete and r <br />schedules. No progress payment shall <br />CONTRACTOR until acceptable sch <br />submitted to ENGINEER. <br />1. The progress schedu <br />acceptable to ENGINEER if it <br />orderly progression of the Work t• <br />within any specified Milestone <br />Contract Times. Such accepta <br />impose on ENGINEER responsi' <br />progress schedule, for sequencing, <br />or progress of the Work nor inte <br />relieve CONTRACTOR from CON <br />full responsibility therefor. <br />2. CONTRACTOR's sched <br />Drawing and Sample submitt- <br />acceptable to ENGINEER if it <br />workable arrangement for rev <br />processing the required submittals. <br />3. CONTRACTOR's sched <br />will be acceptable to ENGINEER <br />and substance if it provides a <br />allocation of the Contract Price t• <br />parts of the Work. <br />attended by <br />:s appropri- <br />to ENGI- <br />ubmitted in <br />TRACTOR <br />corrections <br />-submit the <br />•e made to <br />dules are <br />e will be <br />rovides an <br />completion <br />and the <br />ce will not <br />ility for the <br />scheduling, <br />ere with or <br />RACTOR's <br />le of Shop <br />Is will be <br />provides a <br />ewing and <br />le of values <br />as to form <br />reasonable <br />component <br />ARTICLE 3 - CONTRACT DOCUMENT`: INTENT, <br />AMENDING, REUSE <br />3.01 Intent <br />A. The Contract Documents a e comple- <br />mentary; what is called for by one is as •inding as if <br />called for by all. <br />B. It is the intent of the Contract D. uments to <br />describe a functionally complete Project (iir part there- <br />of) to be constructed in accordance with he Contract <br />Documents. Any labor, documentation, services, <br />materials, or equipment that may reasonably be <br />inferred from the Contract Documen s or from <br />prevailing custom or trade usage as bein required to <br />produce the intended result will be provi ed whether <br />or not specifically called for at no addit onal cost to <br />OWNER. <br />00700 - General Conditiohs REV 5-10-13.doc <br />00700 - 9 <br />F:1Public Works\ENGINEERING DMSION PROJECTS11314-107th Ave Milling90th St to 94th St\Adminlbid documents\Master Contract Documents100700 - General C nditions REV 5-10- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.