Laserfiche WebLink
CONTRACTOR will not permit overtime work or the <br />performance of Work on Saturday, Sunday, or any <br />legal holiday without OWNER's written consent (which <br />will not be unreasonably withheld) given after prior <br />written notice to ENGINEER. <br />6.03 Services, Materials, and Equipment <br />A. Unless otherwise specified in the General Re- <br />quirements, CONTRACTOR shall provide and <br />assume full responsibility for all services, materials, <br />equipment, labor, transportation, construction <br />equipment and machinery, tools, appliances, fuel, <br />power, light, heat, telephone, water, sanitary facilities, <br />temporary facilities, and all other facilities and <br />incidentals necessary for the performance, testing, <br />start-up, and completion of the Work. <br />B. All materials and equipment incorporated into <br />the Work shall be as specified or, if not specified, shall <br />be of good quality and new, except as otherwise <br />provided in the Contract Documents. All warranties <br />and guarantees specifically called for by the Specifica- <br />tions shall expressly run to the benefit of OWNER. If <br />required by ENGINEER, CONTRACTOR shall fumish <br />satisfactory evidence (including reports of required <br />tests) as to the source, kind, and quality of materials <br />and equipment All materials and equipment shall be <br />stored, applied, installed, connected, erected, <br />protected, used, cleaned, and conditioned in <br />accordance with instructions of the applicable <br />Supplier, except as otherwise may be provided in the <br />Contract Documents. <br />6.04 Progress Schedule <br />A. CONTRACTOR shall adhere to the progress <br />schedule established in accordance with paragraph <br />2.07 as it may be adjusted from time to time as <br />provided below. <br />1. CONTRACTOR shall submit to <br />ENGINEER for acceptance (to the extent indi- <br />cated in paragraph 2.07) proposed adjustments <br />in the progress schedule that will not result in <br />changing the Contract Times (or Milestones). <br />Such adjustments will conform generally to the <br />progress schedule then in effect and additional- <br />ly will comply with any provisions of the General <br />Requirements applicable thereto. <br />2. Proposed adjustments in the <br />progress schedule that will change the Contract <br />Times (or Milestones) shall be submitted in <br />accordance with the requirements of Article 12. <br />Such adjustments may only be made by a <br />Change Order or Written Amendm: nt in accor- <br />dance with Article 12. <br />6.05 Substitutes and "Or -Equals" <br />A. Whenever an item of material or <br />specified or described in the Contract D• <br />using the name of a proprietary item or the <br />particular Supplier, the specification or d <br />intended to establish the type, function, <br />and quality required. Unless the spe <br />description contains or is followed by w. <br />that no like, equivalent, or "or -equal" <br />substitution is permitted, other items of <br />equipment or material or equipment of oth <br />may be submitted to ENGINEER for revie <br />circumstances described below. <br />quipment is <br />uments by <br />nameofa <br />scription is <br />ppearance, <br />ification or <br />rds reading <br />tem or no <br />material or <br />-r Suppliers <br />under the <br />1. "Or -Equal" Items: If in :NGINEER's <br />sole discretion an item of material .r equipment <br />proposed by CONTRACTOR is functionally <br />equal to that named and sufficienty similar so <br />that no change in related Work will be required, <br />it may be considered by ENGIN ER as an <br />"or -equal" item, in which case review and <br />approval of the proposed ite may, in <br />ENGINEER's sole discretion, be a omplished <br />without compliance with some o all of the <br />requirements for approval of prop sed substi- <br />tute items. For the purposes of thi paragraph <br />6.05.A.1, a proposed item of material or <br />equipment will be considered funct onally equal <br />to an item so named it <br />a. in the exercise of reasonable <br />judgment ENGINEER determin s that (i) it <br />is at least equal in quali , durability, <br />appearance, strength, a d design <br />characteristics; (ii) it will reliabl perform at <br />least equally well the function imposed by <br />the design concept of the comp eted Project <br />as a functioning whole, and; <br />b. CONTRACTOR certifi <br />there is no increase in cost to <br />and (ii) it will conform subst <br />with deviations, to the detailed <br />of the item named in t <br />Documents. <br />2. Substitute Items <br />a. If in ENGINEER's sole <br />item of material or equipment <br />CONTRACTOR does not q <br />"or -equal" item under paragrap <br />will be considered a propos <br />item. <br />s that (i) <br />e OWNER; <br />ntially, even <br />equirements <br />e Contract <br />iscretion an <br />proposed by <br />alify as an <br />6.05.A.1, it <br />d substitute <br />11 <br />00700 - General Conditi• <br />00700 -19 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314107th Ave Milling90th St to 94th St\Admin\bid documents Master Contract Documents100700 - General C <br />13.doc <br />ns REV 510-13.doc <br />nditions REV 5-10- <br />