My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/7/1992
CBCC
>
Meetings
>
1990's
>
1992
>
4/7/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:31 PM
Creation date
6/16/2015 11:24:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/07/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � r <br />construction of the golf course so that all facilities are ready <br />and available for the opening of play which we are hoping will be <br />the first of next year. <br />Director Davis advised that we have 240 calendar days to <br />complete the project. <br />THE CHAIRMAN CALLED FOR THE QUESTION. The <br />Motion was voted on and carried unanimously. <br />STATUS OF INSTALLATION OF TRAFFIC LIGHT AT U.S #1 AND HIGHLAND <br />DRIVE - VERO HIGHLANDS <br />Commissioner Bird noted that staff has been working on the <br />installation of a signal at this intersection for some time, and <br />asked Public Works Director Jim Davis to elaborate on its status. <br />Director Davis reported that we retained a consultant to <br />design the signalization and those plans were finished plans last <br />winter. The plans were sent to the DOT and we received preliminary <br />approval in December, 1991. In March the DOT sent some changes <br />that they wanted incorporated into the design and the consultants <br />have just completed changing the drawings. We also are working <br />with the DOT for them to fund a portion of the work since U.S. #1 <br />is a state highway. The DOT has a continuing contract with a <br />signal installation company to provide certain equipment and <br />materials, and -the County is trying to take advantage of that to <br />save approximately $15,000-$20,000 on the project. Now that the <br />changes have been incorporated into the drawings, we hope the DOT <br />will approve the project quickly. The DOT has ordered the poles <br />which will be delivered to the County within 30 days, and we have <br />asked FP&L to move their power lines as soon as possible. Director <br />Davis estimated that the light would be in full operation in 60-75 <br />days. <br />Commissioner Bowman inquired about the light at the corner at <br />CR -512 and Barber Street, and Director Davis advised that the <br />signalization installation is complete and we are waiting for FP&L <br />to energize the controller in the signal. <br />64 <br />C <br />BOOK C�c� PAut " J <br />
The URL can be used to link to this page
Your browser does not support the video tag.