Laserfiche WebLink
Indian River County I Impact Fee Update Study <br /> Cost Component <br /> The cost of providing roadway system capacity has decreased in recent years. Construction <br /> costs increased significantly in Florida between 2005 and 2007 due to additional <br /> construction demand caused by hurricanes, the housing market growth, and other factors. <br /> Appreciation in land values also resulted in higher right-of-way (ROW) costs during the same <br /> period. In early 2008, costs started to stabilize, and in recent years, communities have <br /> experienced a decrease in construction costs, returning to levels seen before 2005. Cost <br /> information from Indian River County, other Florida Counties, and the Florida Department <br /> of Transportation (FDOT) was reviewed to develop a unit cost for all phases involved in the <br /> construction of one lane-mile of roadway capacity. The following subsections summarize <br /> the methodology and findings of the total unit cost analysis for county and state roads. <br /> Appendix C provides the data and other support information utilized in these analyses. <br /> County Roadway Costs <br /> This section examines the right-of-way (ROW), construction, and other cost components <br /> associated with county roads with respect to transportation capacity improvements in <br /> Indian River County. For this purpose, recent bid data for ongoing projects provided by the <br /> County and recent construction bid data from county roadway projects throughout Florida <br /> were used to identify and provide supporting cost data for county improvements. The cost <br /> for each roadway capacity project was separated into four phases: design, <br /> construction/engineering inspection (CEI), ROW and construction. <br /> Design and CEI <br /> Design costs for county roads were estimated at 10 percent construction phase costs based <br /> on a review of cost data collected for recent transportation impact fee studies throughout <br /> Florida. Additional detail is provided in Appendix C,Table C-10. <br /> CEI costs for county roads were estimated at 9 percent of construction phase costs based on <br /> a review of cost data collected for recent transportation impact fee studies throughout <br /> Florida. Additional detail is provided in Appendix C,Table C-16. <br /> Right-of-Way <br /> The ROW cost reflects the total cost of the acquisitions along a corridor that were necessary <br /> to have sufficient cross-section width to widen an existing road or, in the case of new <br /> construction, to build a new road. A review of recent ROW cost data for Indian River <br /> Tindale-Oliver&Associates, Inc. Indian River County <br /> June 2014 109 Impact Fee Update Study <br /> I`1`4 <br />