Laserfiche WebLink
Indian River County I Impact Fee Update Study <br /> Cost Component <br /> The capital costs of providing educational facilities includes three components, including the <br /> school facility cost, transportation cost, and ancillary facility costs. This section addresses <br /> each of these components. <br /> FacilitV Cost per Student Station <br /> The first step in determining the cost of providing public schools to Indian River County <br /> residents is to calculate the facility cost per student station. Several cost components must <br /> be considered when calculating the total cost of constructing a school, including <br /> architectural/civil design/site improvement costs; construction costs; furniture,fixtures, and <br /> equipment (FF&E) costs; and the cost to purchase the land. Each component of the school <br /> facility cost is described in more detail in the following subsections. <br /> Architectural/Civil Design/Site Improvement, Construction and FF&E Costs <br /> To determine the administration, architect/civil design/site improvement, construction, and <br /> FF&E costs associated with building a new school in Indian River County, cost information <br /> was obtained for new schools built or proposed in Indian River County. The most recent <br /> construction included Storm Grove Middle School (opened in 2009), and renovation and <br /> expansion of the Vero Beach Elementary School (opened in 2012). In addition to these <br /> schools, insurance values of the existing schools and estimates included in the Educational <br /> Plant Survey for upcoming school expansions were reviewed and supplemented with <br /> discussions with the District's representatives. Given the recent fluctuations in construction <br /> costs and the limited number of schools built in the County over the past few years, a <br /> review of schools that were built over the past five years throughout the State was <br /> conducted. This database included approximately 135 schools. Of these, approximately 20 <br /> were built in 2011. Based on this information, a construction cost of $145 per net square <br /> foot was used in the study for elementary schools, $175 per net square foot for middle <br /> schools, and $185 per net square foot for high schools, with a weighted average <br /> construction cost of $165 per net square foot for all school levels. Appendix A provides <br /> additional information on cost estimates. <br /> The architectural, civil design, site preparation (including on-site improvement and traffic <br /> control costs), and FF&E costs (including technology) are calculated based on the ratio of <br /> these costs to the construction costs observed in Indian River County and other <br /> jurisdictions. These figures were also discussed with the District representatives and are <br /> Tindale-Oliver&Associates, Inc. Indian River County <br /> June 2014 130 Impact Fee Update Study <br /> I <br />