My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/2015 Impact Fee Update
CBCC
>
Meetings
>
2010's
>
2015
>
11/10/2015 Impact Fee Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 2:04:05 PM
Creation date
3/3/2016 10:42:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/10/2015
Meeting Body
Board of County Commissioners
Subject
Impact Fee Update Study
Tindale Oliver & Associates
Supplemental fields
SmeadsoftID
13707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County I Impact Fee Update Study <br /> In addition to looking at local data, a review of recently bid projects located throughout the <br /> state of Florida was conducted. As shown in Table C-15, a total of 52 projects (including the <br /> three projects in Indian River County) from 26 different counties estimated a weighted <br /> average cost per lane mile of$2.44 million per lane mile. <br /> Due to the lower construction costs observed between local county roads and statewide <br /> county improvements, and the small sample size of local state road improvements, the <br /> estimated state road construction cost was adjusted downward to provide a conservative <br /> estimate for use in the impact fee calculation. This adjustment was based on the ratio of <br /> local county roadway improvements to statewide county roadway improvements, which, as <br /> previously mentioned, is 83 percent. Therefore,the weighted average construction cost per <br /> lane mile for all state road improvements (including local and statewide data) was adjusted <br /> by 83 percent. Based on this analysis, a construction cost of$2.00 million per lane mile for <br /> urban-design state roadways was used to calculate the transportation impact fee for Indian <br /> River County. <br /> Table C-7 <br /> Construction Cost Adjustment—State Roads <br /> Construction Section Design Weighted <br /> Road Type Cost per Lane (2) Constr.Cost per <br /> Mile(l) Distribution Lane Mile(3) <br /> Urban Design $2,000,000 34%1 $680,000 <br /> Rural Design $1,660,0001 66%1 $1,096,000 <br /> Weighted Average Construction Cost per Lane Mile 1 $1,776,000 <br /> (1) Source:Table C-15. Rural design is estimated at 83%of urban design costs <br /> (2) Source:Appendix C,Table C-17(Items c and d) <br /> (3) Construction cost per lane mile (Item 1) multiplied by the associated section <br /> design weight(Item 2)for each design type and added together. <br /> Construction Engineering/Inspection <br /> County Roadways <br /> The CEI cost factor for county roads was estimated as a percentage of the construction cost <br /> per lane mile. This factor was determined through a review of the CEI-to-construction cost <br /> ratios for county road unit costs in previously completed impact fee studies throughout <br /> Florida. For county roadways, the CEI factors ranged from 4 percent to 14 percent, with a <br /> weighted average of 9 percent. For purposes of this update study, the CEI cost for county <br /> roads was calculated at 9 percent of the construction cost per lane mile (see Table C-16 for <br /> additional information). <br /> Tindale-Oliver&Associates, Inc. Indian River County <br /> June 2014 C-6 Impact Fee Update Study <br /> Z2.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.