|
Indian River County Impact Fee Update Study
<br /> Table C-14
<br /> Construction Cost-County Road Improvements from Other Jurisdictions throughout Florida L nes Lane Miles Construction construction Cost
<br /> County District
<br /> Description ••
<br /> Collier 1 Santa Barbara Blvd Ext Rattlesnake Hammock Rd Davis Blvd 2008 Bid Oto 6 Urban 2.00 6 12.00 512,035,894 $1,002,991
<br /> Polk 1 Silver Connector Rd E.F.Griffin Rd us 98 2008 Bid Oto2 Urban 0.33 2 $2,364,368
<br /> 0.66 51,560,483
<br /> Polk 1 County Line Rd Ewe 11 Ave Pipkin Rd 2008 Bid 2to4 Urban 1.20 2 2.40 53,993,892 $1,664,122
<br /> Volusia 5 Debary Ave Deltona Blvd Providence Blvd 2008 Bid 2to4 Urban 1.84 2 3.68 $7,405,914 $2,012,477
<br /> Volusia 5 S.Williamson Blvd(Ph.II) S.of Sabal Creek Blvd N.of Moody Bridge 2008 Bid 2to 4 Urban 1.91 2 3.82 511,109,225 $2,908,174
<br /> Lake 5 CR 466(Segment A) U5301 CR 319 2006 Bid 2to4 Urban 1.00 2 2.00 $4,062,660 $2,031,330
<br /> Hillsborough 7 40th St River Pines Apts Humphrey St 2008 Bid 2to4 Urban 0.95 2 1.90 $5,154,862 $2,713,085
<br /> Hillsborough 7 Race TrackM(Ph.l) Douglas Rd Linebaugh Ave 2008 Bid 2to6 Urban 1.01 4 4.04 $10,099,911 52,499,978
<br /> Osceola 5 John Young Pkwy Carroll Orange Co.Line 2008 Bid Oto 6 Urban 0.85 2 1.70 $3,230,000 $1,900,000
<br /> Orange 5 CR 535(Segments C and E) Ficquette Rd Butler Ridge Or 2008 Bid 2 to 4 Urban 1.10 2 2.20 $3,693,616 $1,678,916
<br /> Orange 5 Clarcona-Ocoee Rd Ocoee Apopka Rd SR 417 2006 Bid 2 to 4 Urban 0.40 2 0.80 $2,803,484 $3,504,355
<br /> Oran e 5 Destination Pkwy International Or Tradeshow Blvd 2008 Bid 2to4 Urban 0.71 2 1.42 53,017,443 $2,124,960
<br /> Lee 1 Gladiolus Or(Ph.I) A&W Bulb Rd Winkler Rd 2008 Bid 2t 4/6 Urban 1.94 2/4 5.44 513,971,509 $2,568,292
<br /> Lee 1 GI adiol us Or(Ph.ll) Pine Ridge Rd A&W Bulb Rd 2008 Bid 2to4 Urban 1.02 2 2.04 $6,748,642 $3,308,158
<br /> Charlotte 1 Toledo Blade Corridor North Port U541 2008 Bid 2to4 Suburban 1.20 2 2.40 $3,174,852 $1,322,855
<br /> Orange 5 Clarcona-Ocoee Rd Hiawassee Rd Clark 2009 Bid 2to 4 Urban 2.50 2 5.00 510,182,738 $2,036,548
<br /> Orange 5 Woodbury Rd S.ofSR Challenger Pkwy 2009 Bid 2to4 Urban 0.65 2 1.30 54,068,942 $3,145,340
<br /> Orange 5 Sand Lake Rd President's Or FL Mail 2009 Bid 2to4 Urban 1.00 2 2.00 $6,020,755 $3,010,378
<br /> Orange 5 Taft-Vineland Road Extension Central Florida Pkwy John Young Pkwy 2009 Bid 2to4 Urban 0.70 2 1.40 $4,462,535 $3,187,525
<br /> Osceola 5 Narcoossee Rd U5192 Orange Co.Line 2009 Bid 2to4 Urban 7.40 2 14.80 547,360,000 $3,200,000
<br /> Osceola 5 Osceola Pkwy(Ph.l) FLTurnpike Buenaventura Blvd 2009 Bid 4to6 Urban 1.57 2 3.14 $5,966,000 $1,900,000
<br /> Osceola 5 Poinciana Blvd(Ph.IQ Crescent Lakes US 17/92 2009 Bid 2 to 4 Urban 2.50 2 5.00 $16,000,000 $3,200,000
<br /> Osceola 5 Old Lake Wilson Rd lPh.l) Livingston Rd Sinclair Rd 2009 Bid 2to4 Urban 2.30 2 4.60 $14,720.000 $3,200,000
<br /> Hillsborough 7 Bruce B.Downs Palm Springs Blvd Pebble Beach Blvd 2009 Bid Oto 8 Urban 7.20 4 28.80 $40,575,305 $1,408,865
<br /> Hillsborough 7 Race Track Rd(Ph.IV) Douglas Rd Hillsborough Ave 2009 Bid 2to6 Urban 0.56 4 2.24 $4,397,412 $1,963,130
<br /> Sarasota 1 Fruitville Rd(Ph.l) Tatum Rd Debrecen Rd 2009 Bid 2to4 Urban 0.72 2 1.44 $4,355,796 $3,024,858
<br /> Sarasota 1 Fruitville Rd(Ph.II) Coburn Rd Tatum Rd 2009 Bid 2to 4 Urban 1.26 2 2.52 $8,557,904 $3,395,994
<br /> Lee 1 Colonial Blvd(CR 884) 1-75 SR 82 2009 Bid 4 to 6 Urban 2.70 2 5.40 $14,576,393 $2,699,332
<br /> Collier 1 Oil Well Rd(Segment 2) Immokalee Rd Everglades Blvd 2009 Bid 2to4/6 Urban 5.05 2/4 10.92 516,759,586 $1,534,761
<br /> Collier 1 Oil WeII Rd(Segment 4) Oil Well Grade Rd W.of Camp Keais Rd 2009 Bid 2t 6 Urban 4.72 4 18.88 $17,919,244 $949,113
<br /> Orange 5 Alafa aTr Avalon Park Blvd Mark Twain Blvd 2010 Bid 2to4 Urban 3.83 2 7.66 516,918,599 52,469,791
<br /> Hillsborough 7 Boyette Rd(Ph.III) McMullen Rd Bell Shoals Rd 2010 Bid 2to 4 Urban 2.60 2 5.20 523,184,354 $4,458,530
<br /> Broward 4 Bailey Rd NW 64th Ave/SW 81st Ave SR7(US 441) 2010 Bid 2to4 Urban 2.00 2 4.00 $6,330,297 51,582,574
<br /> Lee 1 Six Mile Cypress Pkwy Daniels Pkwy S.of Wl nkler Rd Ext. 2010 Bid 2 to 4 Urban 3.09 2 6.18 $6,711,242 51,085,961
<br /> Charlotte 1 Pi per Rd Henry St Jones Loop Rd 2010 Bid 2to4 Suburban 2.10 2 4.20 58,627,803 $2,054,239
<br /> Sarasota 1 North Cattlemen Rd Richardson Rd Desoto Rd 2011 Bid 2to4 Urban 2.55 2 5.10 $12,153,584 $2,383,056
<br /> Lee 1 Daniels Pkwy Chamberlin Pkwy Gateway Blvd 2011 Bid 4to6 Urban 2.05 2 4.10 $2,906,553 $708,915
<br /> Orange 5 Rouse Rd SR 50 Corporate Blvd 2011 Bid 2to4 Urban 2.60 2 5.20 $29,380,249 $5,650,048
<br /> Orange 5 CR 535 See.A Magnolia Park Ct SR 429 2011 Bid 2to4 Urban 1.37 2 2.74 $8,390,570 $3,062,252
<br /> Osceola 5 Goodman Rd Tri-County Sand Mine Rd 2011 Bid Oto 2 Urban 3.53 2 7.06 $7,060,000 $1,000,000
<br /> Pinellas 1 Bryan Dai ry Rd Starkey Rd ICR 1) 72nd St 2011 Bid 4 to 6 Urban 1.47 2 2.94 $10,327,383 53,512,715
<br /> Palm Beach 4 SR 806(Atlantic Ave) W.of Lyons Rd Starkey Rd 2011 Bid 2to4 Urban 0.80 2 1.60 $5,307,643 $3,317,277
<br /> Palm Beach 4 Seminole Pratt Whitney Rd SR 80 N.of Sycamore Dr 2011 Bid 2to 4 Urban 4.30 2 8.60 $9,733,669 $1,131,822
<br /> Charlotte 1 Burnt Store Rd(Ph.I) U541 Notre Dame Blvd 2011 Bid 2to4 Urban 2.40 2 4.80 $13,512,394 $2,815,082
<br /> Palm Beach 4 Seminole Pratt Whitney Rd M Canal S.of Orange Blvd 2012 Bid 2 to 4 Urban 1.30 2 2.60 $3,646,523 $1,402,509
<br /> Polk 1 Kathleen Rd(CR35A)(Ph.II) Galloway Rd Duff Rd 2012 Bid 2 to 4 Urban 3.00 2 6.00 $16,784,760 $2,797,460
<br /> Polk 1 Bartow Northern ConneRor(Ph.l) U598 U517/92 2012 Bid Oto4 Urban 2.00 2 4.00 $11,110,205 $2,777,551
<br /> Volusia 5 Tymber Creek Rd SR 40 Peruvian Ln 2012 Bid 2to4 Urban 0.75 2 1.50 $5,276,057 $3,517,371
<br /> Collier 1 Collier Blvd(CR 951) Golden Gate Blvd Green Blvd 2013 Bid to 6 Urban 2.74 2 5.48 $21,392,039 $3,903,657
<br /> 242.90 $528,758,921 $2,176,858
<br /> Total
<br /> Source:Roadway bids from recent impact fee studies throughout Florida as well as recent bids from the TOA Cost Database,with information having been provided by each respective
<br />County
<br /> Indian River County
<br /> Tindale-Oliver&Associates,Inc.
<br /> C-12 Impact Fee Update Study
<br /> June 2014
<br /> N
<br /> oG
<br />
|