My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/2015 Impact Fee Update
CBCC
>
Meetings
>
2010's
>
2015
>
11/10/2015 Impact Fee Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 2:04:05 PM
Creation date
3/3/2016 10:42:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/10/2015
Meeting Body
Board of County Commissioners
Subject
Impact Fee Update Study
Tindale Oliver & Associates
Supplemental fields
SmeadsoftID
13707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County I Impact Fee Update Study <br /> Building Cost Analysis <br /> To determine the architectural, civil design, site improvement, construction, and FF&E costs <br /> associated with building a new school in Indian River County, the following information was <br /> evaluated: <br /> • Recently built schools in Indian River County; <br /> • Cost estimates included in the Educational Plant Survey; <br /> • Insurance values of the existing schools; <br /> • Cost related information provided by the Indian River County School District; and <br /> • School cost information for 135 schools in other Florida counties. <br /> The following paragraphs provide further detail on this research and analysis. <br /> Construction Cost <br /> The last schools built in Indian River County included the replacement of Vero Beach <br /> Elementary School in 2012 and the construction of a new middle school (Storm Grove <br /> Middle School) in 2009. The cost associated with these schools ranged from $156 per net <br /> square foot for the elementary school to $241 per net square foot for the middle school, as <br /> shown in Table G-2. In addition, the District's Educational Plant Survey includes several <br /> school expansion projects. The estimated cost associated with these expansions ranges <br /> from $228 per net square foot to $343 per net square foot. Discussions with the School <br /> District confirmed that there were certain elements unique to the Storm Grove Middle <br /> School, which resulted in higher cost and the additions tend to be more expensive than new <br /> school construction. Finally, the insurance values of existing school buildings range from <br /> approximately $145 per net square foot for elementary schools to $185 per net square foot <br /> for high schools, with an average of $165 per net square foot for all traditional schools. <br /> These figures are consistent with the construction costs observed in other jurisdictions. <br /> Table G-3 summarizes data obtained from the Florida Department of Education for schools <br /> built in 2011. As shown, the average construction cost is approximately $175 per net <br /> square foot, with a range of $145 per net square foot for elementary schools to $200 per <br /> net square foot for high schools. <br /> Given this data and information, average construction costs of $145 per net square foot for <br /> elementary schools, $175 per net square foot for middle schools, and $185 per net square <br /> Tindale-Oliver&Associates, Inc. Indian River County <br /> June 2014 G-2 Impact Fee Update Study <br /> �LZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.