Laserfiche WebLink
Indian River County I Impact Fee Update Study <br /> Architectural, Civil Design, Site Preparation, Furniture, Fixture and Equipment Costs <br /> The architectural, civil design, site preparation (including on-site improvement and traffic <br /> control costs), and FF&E costs (including technology) are calculated based on the ratio of <br /> these costs to the construction costs observed in Indian River County and other <br /> jurisdictions. These figures were also discussed with the District's representatives and are <br /> estimated at 10 percent of construction for architectural/civil design costs, 10 percent for <br /> site preparation costs, and 7 percent for FF&E costs. Tables G-4 and G-5 summarize the <br /> data obtained from Indian River County and other jurisdictions. <br /> Tindale-Oliver&Associates, Inc. Indian River County <br /> June 2014 G-5 Impact Fee Update Study <br /> 274 <br />